Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 22131 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0176 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,592 | $1,946 | Not Implemented |
IP0176 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $540 | $0 | Not Implemented |
MUWT03 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $314 | $395 | Not Implemented |
MUWT03 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $152 | $350 | Not Implemented |
IP0176 # 03 Y:2023 | 03 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $4,356 | $5,979 | Not Implemented |
MUWT03 # 01 Y:2023 | 01 | 2023 | USE PHOTOCELL CONTROLS | $81 | $532 | Not Implemented |
IP0134 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,106 | $2,237 | Implemented |
IP0134 # 01 Y:2020 | 01 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,050 | $660 | Not Implemented |
IP0134 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,816 | $28,862 | Not Implemented |
IC0216 # 02 Y:2019 | 02 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,893 | $2,460 | Not Implemented |
IC0216 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,900 | $3,585 | Implemented |
IC0216 # 04 Y:2019 | 04 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,942 | $15,000 | Not Implemented |
IC0216 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $8,388 | $10,700 | Implemented |
IP0117 # 01 Y:2019 | 01 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,422 | $412 | Implemented |
IP0117 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,275 | $9,350 | Implemented |
IP0117 # 03 Y:2019 | 03 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,315 | $17,500 | Not Implemented |
IP0117 # 04 Y:2019 | 04 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $23,331 | $134,106 | Not Implemented |
IP0116 # 01 Y:2019 | 01 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $308 | $0 | Implemented |
IP0116 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,151 | $23 | Not Implemented |
IP0116 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $415 | $680 | Not Implemented |
IP0116 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,878 | $14,599 | Implemented |
IP0116 # 05 Y:2019 | 05 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $117,376 | $1,431,096 | Implemented |
IP0103 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $220 | $186 | Implemented |
IP0103 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $524 | $110 | Implemented |
IP0103 # 01 Y:2018 | 01 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,413 | $0 | Not Implemented |