IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

617

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0153 # 01 Y:2019 01 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $48,728 $423,632 Not Implemented
UU0153 # 02 Y:2019 02 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,902 $205,000 Implemented
UU0153 # 03 Y:2019 03 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $22,776 $146,977 Not Implemented
UU0153 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,443 $502 Not Implemented
UU0153 # 05 Y:2019 05 2019 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $2,777 $6,500 Implemented
UU0153 # 06 Y:2019 06 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $899 $2,019 Implemented
UU0153 # 07 Y:2019 07 2019 ADJUST BURNERS FOR EFFICIENT OPERATION $1,444 $400 Implemented
NC0633 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,586 $6,135 Not Implemented
NC0633 # 02 Y:2019 02 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $31,254 $27,000 Implemented
NC0633 # 03 Y:2019 03 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $920 $500 Not Implemented
NC0633 # 04 Y:2019 04 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,540 $10,000 Not Implemented
NC0633 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $1,338 $5,000 Not Implemented
IC0216 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $8,388 $10,700 Implemented
IC0216 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,893 $2,460 Not Implemented
IC0216 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,900 $3,585 Implemented
IC0216 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $1,942 $15,000 Not Implemented
UA0208 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,648 $9,245 Not Implemented
UA0208 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,684 $35,725 Not Implemented
UA0208 # 03 Y:2019 03 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,925 $150 Not Implemented
UA0208 # 04 Y:2019 04 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $102,952 $150 Not Implemented
IP0117 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,422 $412 Implemented
IP0117 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,275 $9,350 Implemented
IP0117 # 03 Y:2019 03 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,315 $17,500 Not Implemented
IP0117 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $23,331 $134,106 Not Implemented
IP0116 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $308 $0 Implemented