IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,603

matching recommendations
Reset
NAICS 22132 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0299 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,372 $2,712 n/a
IC0299 # 02 Y:2024 02 2024 REPAIR AND ELIMINATE STEAM LEAKS $23,893 $3,458 n/a
IC0299 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $554 $642 n/a
IC0299 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $89,084 $34,144 n/a
IC0299 # 05 Y:2024 05 2024 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $263,888 $200,000 n/a
IC0299 # 06 Y:2024 06 2024 BURN A LESS EXPENSIVE GRADE OF FUEL $447,899 $23,503 n/a
IC0299 # 07 Y:2024 07 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,379 $8,310 n/a
IC0299 # 08 Y:2024 08 2024 INSULATE BARE EQUIPMENT $1,981 $847 n/a
IC0299 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $56,790 $31,894 n/a
TR0051 # 03 Y:2023 03 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,922 $2,500 n/a
TR0051 # 02 Y:2023 02 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $10,236 $21,298 n/a
TR0051 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $104,742 $1,421,000 n/a
UF0607 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $183,418 $60,000 Not Implemented
UF0607 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,683 $0 Implemented
UF0607 # 04 Y:2023 04 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $36,207 $25,350 Not Implemented
UF0607 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $94,496 $322,608 Implemented
UF0607 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122,669 $11,700 Implemented
UF0607 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $173,293 $118,890 Implemented
UD1074 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $32,977 $336,971 Implemented
UD1074 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,521 $7,100,000 Implemented
UD1074 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,018 $8,430 Implemented
UD1074 # 02 Y:2024 02 2024 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,621 $12,700 Not Implemented
UD1074 # 01 Y:2024 01 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $9,834 $0 Not Implemented
UF0606 # 06 Y:2023 06 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $214,485 $60,000 Not Implemented
UF0606 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,283 $0 Implemented