Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2023, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
Learn More:
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews starting with December 31, 2023
*See Full Grant Solicitation for full qualification and selection details.
9,151
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1070 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,744 | $0 | n/a |
UD1070 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,729 | $2,893 | n/a |
UD1070 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $5,413 | $160 | n/a |
UD1070 # 05 Y:2024 | 05 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $92,634 | $704,952 | n/a |
UD1070 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,179 | $2,400 | n/a |
UA0277 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,476 | $81,775 | n/a |
UA0277 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $27,216 | $2,500 | n/a |
UA0277 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,464 | $8,591 | n/a |
UA0277 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $3,286 | $3,921 | n/a |
UA0277 # 06 Y:2023 | 06 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $712 | $800 | n/a |
UA0277 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,523 | $4,208 | n/a |
LT8382 # 07 Y:2024 | 07 | 2024 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $8,567 | $56,250 | n/a |
LT8382 # 03 Y:2024 | 03 | 2024 | USE PHOTOCELL CONTROLS | $731 | $328 | n/a |
LT8382 # 04 Y:2024 | 04 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,755 | $8,100 | n/a |
LT8382 # 05 Y:2024 | 05 | 2024 | REPLACE AIR CURTAIN DOORS WITH SOLID DOORS | $2,042 | $4,483 | n/a |
LT8382 # 01 Y:2024 | 01 | 2024 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,178 | $61,016 | n/a |
LT8382 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $2,120 | $600 | n/a |
LT8382 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,368 | $8,172 | n/a |
DL0230 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,919 | $2,200 | n/a |
DL0230 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,146 | $2,040 | n/a |
DL0230 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $100,915 | $74,000 | n/a |
DL0230 # 06 Y:2024 | 06 | 2024 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $15,141 | $10,000 | n/a |
DL0230 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,418 | $0 | n/a |
DL0230 # 02 Y:2024 | 02 | 2024 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $44,058 | $22,437 | n/a |
DL0230 # 01 Y:2024 | 01 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $13,779 | $15,504 | n/a |