IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0499 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,700 $5,700 Implemented
OR0499 # 09 Y:2006 09 2006 UPGRADE CONTROLS ON COMPRESSORS $6,400 $19,000 Implemented
OR0499 # 10 Y:2006 10 2006 OPTIMIZE PLANT POWER FACTOR $2,460 $8,200 Implemented
MI0129 # 01 Y:2006 01 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,749 $400 Implemented
MI0129 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,075 $1,410 Implemented
SF0327 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $494 $0 Implemented
SF0327 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $22,857 $7,377 Implemented
SF0327 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $1,461 Implemented
SF0327 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,338 $24,888 Implemented
SF0327 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,234 $9,460 Implemented
MA0603 # 02 Y:2006 02 2006 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $54,146 $2,000 Implemented
MA0603 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,920 $83,405 Implemented
MA0603 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $34,778 $8,125 Implemented
MA0603 # 07 Y:2006 07 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,595 $83,500 Implemented
MA0603 # 08 Y:2006 08 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,480 $50,000 Implemented
MA0603 # 10 Y:2006 10 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,287 $0 Implemented
MA0603 # 11 Y:2006 11 2006 BURN WASTE OIL FOR HEAT $3,685 $6,500 Implemented
MA0603 # 14 Y:2006 14 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,402 $0 Implemented
MA0603 # 15 Y:2006 15 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $874 $4,000 Implemented
MA0603 # 16 Y:2006 16 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $650 $4,000 Implemented
MA0603 # 17 Y:2006 17 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $172 $0 Implemented
MI0128 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,372 $31,540 Implemented
MI0128 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,703 $1,074 Implemented
MI0128 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,984 $30 Implemented
AM0507 # 01 Y:2006 01 2006 COMBINE UTILITY METERS $71,000 $100,000 Implemented