IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,077

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0536 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,036 $2,440 Implemented
LE0536 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,974 $35,815 Implemented
LT8368 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $585 $852 Implemented
SF0591 # 02 Y:2022 02 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $9,922 $0 Implemented
SF0591 # 03 Y:2022 03 2022 REDUCE EXCESS STEAM BLEEDING $9,616 $0 Implemented
SF0591 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $6,698 $0 Implemented
SF0591 # 06 Y:2022 06 2022 INSTALL SET-BACK TIMERS $22,648 $6,467 Implemented
SF0591 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,540 $14,724 Implemented
SF0591 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,521 $18,051 Implemented
UW2207 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,161 $0 Implemented
UW2207 # 02 Y:2022 02 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $112 Implemented
UW2207 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,631 $2,080 Implemented
UF0585 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,858 $44,939 Implemented
UF0585 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $11,758 $1,342 Implemented
UF0585 # 03 Y:2022 03 2022 INSTALL TURBULATORS $6,811 $7,500 Implemented
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented
UF0585 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $19,210 $10,000 Implemented
UW2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $12,938 Implemented
UW2205 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $15,999 Implemented
NL0071 # 02 Y:2022 02 2022 MINIMIZE WATER USAGE $106,955 $72,150 Implemented
NL0071 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,879 $30,410 Implemented
NL0071 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $2,400 $9,724 Implemented
NL0071 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $4,500 Implemented