IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,550

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 n/a
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 n/a
UU0259 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,866,540 $17,885,484 n/a
UU0259 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $221,450 $2,473,450 n/a
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 n/a
UU0259 # 05 Y:2024 05 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $53,643 $33,000 n/a
OR0799 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,039 $0 n/a
OR0799 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $112,659 $399,900 n/a
OR0799 # 03 Y:2024 03 2024 RECOVER WASTE HEAT FROM EQUIPMENT $32,971 $41,770 n/a
OR0799 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,006 $11,189 n/a
OR0799 # 02 Y:2024 02 2024 RECOVER WASTE HEAT FROM EQUIPMENT $10,927 $3,514 n/a
OR0792 # 05 Y:2024 05 2024 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,380 $6,624 n/a
OR0792 # 07 Y:2024 07 2024 PURCHASE EQUIPMENT INSTEAD OF LEASING $395,376 $1,242,029 n/a
OR0792 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $15,081 $1,119 n/a
OR0792 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $2,667 $3,106 n/a
OR0792 # 03 Y:2024 03 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $37,200 $18,409 n/a
OR0792 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,993 $0 n/a
OR0792 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $6,357 $3,090 n/a
LS2421 # 05 Y:2024 05 2024 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $21,228 $141,000 n/a
LS2421 # 04 Y:2024 04 2024 INSTALL WIND POWERED ELECTRIC GENERATOR $148,851 $560,000 n/a
LS2421 # 01 Y:2024 01 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,742 $15,900 n/a
LS2421 # 03 Y:2024 03 2024 USE OTHER WASTE CONCENTRATION METHODS $590,512 $783,539 n/a
LS2421 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $8,504 $12,500 n/a
LS2418 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $38,367 $514,800 n/a
LS2418 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,114 $50 n/a