Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,863
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0581 # 10 Y:2025 | 10 | 2025 | INSTALL OCCUPANCY SENSORS | $123 | $769 | n/a |
SU0581 # 05 Y:2025 | 05 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $697 | $38 | n/a |
SU0581 # 03 Y:2025 | 03 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,466 | $0 | n/a |
SU0581 # 02 Y:2025 | 02 | 2025 | DISCONNECT BALLASTS | $331 | $0 | n/a |
SU0581 # 09 Y:2025 | 09 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,318 | $15,784 | n/a |
SU0581 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,579 | $1,648 | n/a |
SU0581 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,336 | $0 | n/a |
SU0581 # 01 Y:2025 | 01 | 2025 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $990 | $0 | n/a |
SU0581 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $149 | $172 | n/a |
SU0581 # 07 Y:2025 | 07 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,877 | $1,220 | n/a |
IP0215 # 08 Y:2025 | 08 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,523 | $960 | n/a |
IP0215 # 07 Y:2025 | 07 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $58,146 | $9,960 | n/a |
IP0215 # 09 Y:2025 | 09 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,982 | $16,152 | n/a |
IP0215 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,297 | $5,271 | n/a |
IP0215 # 10 Y:2025 | 10 | 2025 | OPTIMIZE PLANT POWER FACTOR | $26,556 | $45,576 | n/a |
IP0215 # 11 Y:2025 | 11 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,206 | $2,279 | n/a |
IP0215 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $26,770 | $1,390 | n/a |
IP0215 # 01 Y:2025 | 01 | 2025 | REDUCE VENTILATION AIR | $14,470 | $0 | n/a |
IP0215 # 05 Y:2025 | 05 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,235 | $276 | n/a |
IP0215 # 04 Y:2025 | 04 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,861 | $1,390 | n/a |
IP0215 # 03 Y:2025 | 03 | 2025 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,579 | $790 | n/a |
SU0577 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,364 | $0 | n/a |
SU0577 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,135 | $2,941 | n/a |
SU0577 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,033 | $372 | n/a |
SU0577 # 01 Y:2025 | 01 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,400 | $0 | n/a |