Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,792
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0601 # 02 Y:2025 | 02 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $44,588 | $1,600 | n/a |
IP0211 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,109 | $25 | n/a |
IP0211 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $4,011 | $0 | n/a |
IP0211 # 02 Y:2025 | 02 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,506 | $0 | n/a |
LE0601 # 09 Y:2025 | 09 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $40,859 | $167,895 | n/a |
IP0211 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $820 | $0 | n/a |
LE0601 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $636 | $1,081 | n/a |
LE0601 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,356 | $0 | n/a |
LE0601 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,248 | $44,740 | n/a |
IP0211 # 08 Y:2025 | 08 | 2025 | INSTALL STEAM TRAP | $2,051 | $4,950 | n/a |
LE0601 # 05 Y:2025 | 05 | 2025 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $18,412 | $23,182 | n/a |
LE0601 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $55,828 | $52,000 | n/a |
IP0211 # 07 Y:2025 | 07 | 2025 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $76,792 | $70,000 | n/a |
LE0601 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $72,625 | $210,000 | n/a |
IP0211 # 05 Y:2025 | 05 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,605 | $573 | n/a |
LE0601 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,225 | $3,680 | n/a |
IP0211 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $1,149 | $361 | n/a |
DL0259 # 05 Y:2025 | 05 | 2025 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,050 | $40,000 | n/a |
DL0259 # 01 Y:2025 | 01 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $45,458 | $19,000 | n/a |
DL0259 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,217 | $5,500 | n/a |
DL0259 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,620 | $30,000 | n/a |
DL0259 # 03 Y:2025 | 03 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $3,091 | $13,000 | n/a |
UD1111 # 02 Y:2025 | 02 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $216 | $0 | n/a |
UD1111 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,758 | $10,506 | n/a |
UD1111 # 01 Y:2025 | 01 | 2025 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $38,544 | $2,352 | n/a |