Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,722
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0621 # 05 Y:2024 | 05 | 2024 | INSTALL STEAM TRAP | $9,822 | $1,988 | n/a |
SF0621 # 06 Y:2024 | 06 | 2024 | INCREASE AMOUNT OF CONDENSATE RETURNED | $335,892 | $109,275 | n/a |
SF0621 # 07 Y:2024 | 07 | 2024 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $6,048 | $1,839 | n/a |
SF0621 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,248 | $2,796 | n/a |
SF0621 # 09 Y:2024 | 09 | 2024 | INSULATE BARE EQUIPMENT | $17,564 | $9,294 | n/a |
SF0621 # 10 Y:2024 | 10 | 2024 | INSTALL ISOLATION TRANSFORMER ON ADJUSTABLE FREQUENCY DRIVE | $26,726 | $23,394 | n/a |
SF0621 # 11 Y:2024 | 11 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,426 | $15,810 | n/a |
SF0621 # 12 Y:2024 | 12 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $238,787 | $1,065,639 | n/a |
UL2406 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $21,720 | $14,950 | n/a |
UL2406 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,741 | $12,220 | n/a |
UL2406 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,721 | $15,563 | n/a |
UL2406 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $112 | $406 | n/a |
UL2406 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,826 | $10,980 | n/a |
UL2406 # 06 Y:2024 | 06 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $4,470 | $1,120 | n/a |
UL2406 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,544 | $12,225 | n/a |
UL2406 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,236 | $775,946 | n/a |
UL2406 # 09 Y:2024 | 09 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $35,350 | $159,350 | n/a |
LS2412 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,703 | $150 | Not Implemented |
LS2412 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $2,908 | $275 | Not Implemented |
LS2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $872 | $135 | Implemented |
LS2412 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,854 | $5,915 | Implemented |
LS2411 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,595 | $50 | Not Implemented |
LS2411 # 02 Y:2024 | 02 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $266 | $45 | Implemented |
LS2411 # 03 Y:2024 | 03 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $26,395 | $18,900 | Not Implemented |
LS2411 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,962 | $12,050 | Implemented |