Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
610
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0309 # 03 Y:2017 | 03 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,478 | $320 | Implemented |
MI0309 # 04 Y:2017 | 04 | 2017 | INSULATE BARE EQUIPMENT | $4,544 | $1,640 | Implemented |
MI0309 # 05 Y:2017 | 05 | 2017 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,389 | $1,729 | Implemented |
MI0309 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,090 | $1,882 | Implemented |
MI0309 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,772 | $6,223 | Implemented |
MI0309 # 08 Y:2017 | 08 | 2017 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $649 | $210 | Implemented |
MI0309 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $307 | $1,591 | Implemented |
MI0287 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,717 | $1,400 | Not Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
MI0287 # 04 Y:2015 | 04 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,439 | $160 | Not Implemented |
MI0287 # 05 Y:2015 | 05 | 2015 | USE OPTIMUM THICKNESS INSULATION | $2,395 | $8,535 | Not Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 07 Y:2015 | 07 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,047 | $280 | Not Implemented |
MI0287 # 08 Y:2015 | 08 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $907 | $336 | Not Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |
MI0277 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,740 | $7,980 | Implemented |
MI0277 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,327 | $16,640 | Implemented |
MI0277 # 03 Y:2015 | 03 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,747 | $23,500 | Implemented |
MI0277 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,899 | $4,691 | Implemented |
MI0277 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,958 | $7,530 | Implemented |
MI0277 # 06 Y:2015 | 06 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,508 | $1,660 | Implemented |
MI0277 # 07 Y:2015 | 07 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,776 | $1,120 | Implemented |
MI0277 # 08 Y:2015 | 08 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,698 | $639 | Implemented |