IAC logo
IAC Assessment: MI0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2017
Principal Product Tortillas
NAICS 311830 - Tortilla Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 40,000
Annual Production 1,040,000 Bushels
Production Hrs. Annual 4,468
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,454 2,403,840 kWh $0.04
Electricity Demand $88,674 7,386 kW-months/year $12.01
Electricity Fees $28,731 - $ -
Natural Gas $164,562 19,846 MMBtu $8.29
TOTAL ENERGY COSTS $430,713
RECOMMENDED SAVINGS* $50,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,993
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,370
Cost:
$1,640
$16,370 380,692 - - - - - - - - $16,370
380,692
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$13,394
Cost:
$34,000
$7,583 176,351 $5,811 484 - - - - - - $7,583
176,351
kWh
$5,811
484
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,478
Cost:
$320
$4,286 99,683 $2,192 183 - - - - - - $4,286
99,683
kWh
$2,192
183
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,544
Cost:
$1,640
- - - - $4,544 548 - - - - -
-
kWh
-
-
kW-months/year
$4,544
548
MMBtu
-
-
Tgal
-
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,389
Cost:
$1,729
- - - - - - $4,389 536 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,389
536
Tgal
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,090
Cost:
$1,882
$1,749 40,664 $1,341 112 - - - - - - $1,749
40,664
kWh
$1,341
112
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,772
Cost:
$6,223
$1,037 24,118 $735 61 - - - - - - $1,037
24,118
kWh
$735
61
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS Savings:
$649
Cost:
$210
- - - - - - - - $649 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$649
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$307
Cost:
$1,591
$307 7,139 - - - - - - - - $307
7,139
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$50,993
Cost:
$49,235
$31,332 728,647 $10,079 840 $4,544 548 $4,389 536 $649 - $31,332
728,647
kWh
$10,079
840
kW-months/year
$4,544
548
MMBtu
$4,389
536
Tgal
$649
-
$
TOTAL IMPLEMENTED Savings:
$50,993
Cost:
$49,235
$31,332 728,647 $10,079 840 $4,544 548 $4,389 536 $649 - $31,332
728,647
kWh
$10,079
840
kW-months/year
$4,544
548
MMBtu
$4,389
536
Tgal
$649
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes