IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0492 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $7,565 $13,378 Implemented
SF0492 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $165 $292 Implemented
SF0492 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $8,681 $17,643 Implemented
SF0492 # 11 Y:2016 11 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $12,365 $30,659 Implemented
SF0492 # 12 Y:2016 12 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,145 $45,338 Not Implemented
BS0085 # 01 Y:2016 01 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $679 $2,240 Not Implemented
BS0085 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $736 $390 Not Implemented
BS0085 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $348 $108 Not Implemented
BS0085 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $276 $607 Not Implemented
BS0085 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $11,091 $13,382 Not Implemented
BS0085 # 06 Y:2016 06 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $974 $528 Not Implemented
BS0085 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $1,036 $2,249 Not Implemented
BS0085 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $600 Not Implemented
BS0085 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN WATER LINES AND VALVES $139 $16 Not Implemented
BS0085 # 10 Y:2016 10 2016 UPGRADE OBSOLETE EQUIPMENT $15,075 $16,355 Not Implemented
BS0085 # 11 Y:2016 11 2016 INSULATE FEEDWATER TANK $291 $565 Not Implemented
UD0956 # 01 Y:2016 01 2016 INSTALL TURBULATORS $15,641 $5,625 Not Implemented
UD0956 # 02 Y:2016 02 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,421 $14,000 Not Implemented
UD0956 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,897 $12,000 Not Implemented
UD0956 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,229 $0 Not Implemented
UD0956 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $8,199 $12,220 Not Implemented
UD0956 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $26,938 $30,000 Not Implemented
UD0956 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,566 $24,600 Not Implemented
UD0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $1,966 $3,394 Not Implemented
UD0956 # 09 Y:2016 09 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,433 $40,000 Not Implemented