IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0495 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,370 $6,127 Implemented
SF0495 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,562 $3,136 Not Implemented
SF0495 # 04 Y:2016 04 2016 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,447 $8,329 Implemented
SF0495 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $2,590 $6,532 Implemented
SF0495 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,109 $0 Not Implemented
BD0493 # 01 Y:2016 01 2016 USE RADIANT HEATER FOR SPOT HEATING $17,520 $1,900 n/a
BD0493 # 02 Y:2016 02 2016 REPLACE BOILER $7,259 $14,000 n/a
BD0493 # 03 Y:2016 03 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,620 $6,000 n/a
BD0493 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,605 $600 n/a
BD0493 # 05 Y:2016 05 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,280 $50 n/a
BD0493 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $932 $20 n/a
BD0493 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $925 $1,050 n/a
BD0493 # 08 Y:2016 08 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $188 $500 n/a
OK0956 # 01 Y:2016 01 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,844 $7,700 Not Implemented
OK0956 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,155 $2,536 Not Implemented
OK0956 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,914 $51,634 Not Implemented
OK0956 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $1,488 Not Implemented
OK0956 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $3,000 Not Implemented
OK0956 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $492 $1,325 Not Implemented
OK0956 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,027 $34,182 Not Implemented
OK0956 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $145 $180 Not Implemented
OK0956 # 09 Y:2016 09 2016 INSTALL SET-BACK TIMERS $237 $50 Not Implemented
SU0426 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,669 $7,515 Implemented
SU0426 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,123 $1,486 Not Implemented
SU0426 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $114,014 $187,500 Not Implemented