Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0074 # 03 Y:2016 | 03 | 2016 | REPLACE BOILER | $2,331 | $14,391 | Implemented |
BS0074 # 04 Y:2016 | 04 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $2,326 | $5,073 | Implemented |
BS0074 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $111 | $343 | Not Implemented |
BS0074 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $600 | $2,800 | Not Implemented |
BS0074 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $199 | $14 | Not Implemented |
BS0074 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $530 | $7 | Implemented |
BS0074 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $177 | $483 | Implemented |
MZ0216 # 01 Y:2016 | 01 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $859 | $1,000 | Not Implemented |
MZ0216 # 02 Y:2016 | 02 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,373 | $12,000 | Implemented |
MZ0216 # 03 Y:2016 | 03 | 2016 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $404 | $800 | Implemented |
MZ0216 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $389 | $280 | Not Implemented |
MZ0216 # 05 Y:2016 | 05 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,001 | $2,000 | Implemented |
SF0481 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,477 | $140 | Implemented |
SF0481 # 02 Y:2016 | 02 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,662 | $0 | Implemented |
SF0481 # 03 Y:2016 | 03 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,033 | $0 | Implemented |
SF0481 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,008 | $0 | Not Implemented |
SF0481 # 05 Y:2016 | 05 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $23,373 | $0 | Not Implemented |
SF0481 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $908 | $105 | Implemented |
SF0481 # 07 Y:2016 | 07 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,030 | $208 | Not Implemented |
SF0481 # 08 Y:2016 | 08 | 2016 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $119,304 | $36,151 | Not Implemented |
SF0481 # 09 Y:2016 | 09 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $48,481 | $18,682 | Implemented |
SF0481 # 10 Y:2016 | 10 | 2016 | INSULATE BARE EQUIPMENT | $660 | $769 | Implemented |
SF0481 # 11 Y:2016 | 11 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,601 | $10,000 | Not Implemented |
SF0481 # 12 Y:2016 | 12 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,674 | $10,567 | Not Implemented |
SF0481 # 13 Y:2016 | 13 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,905 | $11,333 | Not Implemented |