Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2017 |
Principal Product | fish, reptile, bird pet food production and packaging |
NAICS | 311119 - Other Animal Food Manufacturing |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 27,000 |
Annual Production | 250,000 Pounds |
Production Hrs. Annual | 2,875 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $55,374 | 491,138 | kWh | $0.11 |
Electricity Demand | $37,593 | 1,228 | kW-months/year | $30.61 |
Natural Gas | $3,853 | 539 | MMBtu | $7.15 |
TOTAL ENERGY COSTS | $96,820 | |||
RECOMMENDED SAVINGS* | $96,929 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,882 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $161 Cost: $294 |
- | - | - | - | - | - | $161 | 23 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$161 23 MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,814 Cost: $7,558 |
$2,555 | 22,622 | $1,321 | 41 | - | - | - | - | $61 | - | $(-123) | - |
$2,555 22,622 kWh |
$1,321 41 kW-months/year |
- - $ |
- - MMBtu |
$61 - $ |
$(-123) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $760 Cost: $2,070 |
$356 | 3,159 | $404 | 13 | - | - | - | - | - | - | - | - |
$356 3,159 kWh |
$404 13 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $7,463 Cost: - |
- | - | $7,463 | 400 | - | - | - | - | - | - | - | - |
- - kWh |
$7,463 400 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $3,907 Cost: - |
- | - | - | - | $3,907 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,907 - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $80,824 Cost: $383,827 |
$45,691 | 412,892 | $35,133 | 1,152 | - | - | - | - | - | - | - | - |
$45,691 412,892 kWh |
$35,133 1,152 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,929 Cost: $393,749 |
$48,602 | 438,673 | $44,321 | 1,606 | $3,907 | - | $161 | 23 | $61 | - | $(-123) | - | $48,602 438,673 kWh |
$44,321 1,606 kW-months/year |
$3,907 - $ |
$161 23 MMBtu |
$61 - $ |
$(-123) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,882 Cost: $7,852 |
$2,555 | 22,622 | $1,321 | 41 | $3,907 | - | $161 | 23 | $61 | - | $(-123) | - | $2,555 22,622 kWh |
$1,321 41 kW-months/year |
$3,907 - $ |
$161 23 MMBtu |
$61 - $ |
$(-123) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Ancillary Material Cost |