IAC Assessment: SF0500
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0500
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2017
Principal Product fish, reptile, bird pet food production and packaging
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 27,000
Annual Production 250,000 Pounds
Production Hrs. Annual 2,875
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,374 491,138 kWh $0.11
Electricity Demand $37,593 1,228 kW-months/year $30.61
Natural Gas $3,853 539 MMBtu $7.15
TOTAL ENERGY COSTS $96,820
RECOMMENDED SAVINGS* $96,929 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,882
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$161
Cost:
$294
- - - - - - $161 23 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$161
23
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,814
Cost:
$7,558
$2,555 22,622 $1,321 41 - - - - $61 - $(-123) - $2,555
22,622
kWh
$1,321
41
kW-months/year
-
-
$
-
-
MMBtu
$61
-
$
$(-123)
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$760
Cost:
$2,070
$356 3,159 $404 13 - - - - - - - - $356
3,159
kWh
$404
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,463
Cost:
-
- - $7,463 400 - - - - - - - - -
-
kWh
$7,463
400
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,907
Cost:
-
- - - - $3,907 - - - - - - - -
-
kWh
-
-
kW-months/year
$3,907
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$80,824
Cost:
$383,827
$45,691 412,892 $35,133 1,152 - - - - - - - - $45,691
412,892
kWh
$35,133
1,152
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$96,929
Cost:
$393,749
$48,602 438,673 $44,321 1,606 $3,907 - $161 23 $61 - $(-123) - $48,602
438,673
kWh
$44,321
1,606
kW-months/year
$3,907
-
$
$161
23
MMBtu
$61
-
$
$(-123)
-
$
TOTAL IMPLEMENTED Savings:
$7,882
Cost:
$7,852
$2,555 22,622 $1,321 41 $3,907 - $161 23 $61 - $(-123) - $2,555
22,622
kWh
$1,321
41
kW-months/year
$3,907
-
$
$161
23
MMBtu
$61
-
$
$(-123)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost