IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
BS0073 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,966 $15,800 Not Implemented
AM0705 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,470 $5,000 Implemented
AM0705 # 02 Y:2016 02 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,905 $0 Not Implemented
AM0705 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,405 $90 Implemented
AM0705 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $600 Implemented
AM0705 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $685 Implemented
AM0705 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,360 Implemented
AM0705 # 07 Y:2016 07 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $760 $0 Not Implemented
AM0705 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $7 Implemented
OK0937 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,095 $1,646 Not Implemented
OK0937 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,667 $5,324 Implemented
OK0937 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,346 $88,560 Implemented
OK0937 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,363 $15,376 Not Implemented
OK0937 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,445 $12,000 Implemented
OK0937 # 06 Y:2016 06 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,197 $2,060 Not Implemented
OK0937 # 07 Y:2016 07 2016 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $74,720 $594,190 Not Implemented
OK0937 # 08 Y:2016 08 2016 OPTIMIZE PLANT POWER FACTOR $9,089 $6,160 Not Implemented
OK0937 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,032 $132,000 Not Implemented
LE0416 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,389 $1,000 Implemented
LE0416 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $22,973 $9,000 Implemented
LE0416 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,060 $4,550 Not Implemented
LE0416 # 04 Y:2016 04 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,534 $19,000 Not Implemented
LE0416 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,285 $11,000 Not Implemented