IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0773 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,051 $797 Implemented
OR0773 # 03 Y:2023 03 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $8,507 $13,124 Not Implemented
OR0773 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,262 $12,121 Not Implemented
LS2314 # 01 Y:2023 01 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,310 $0 Implemented
LS2314 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,404 $135 Implemented
LS2314 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $3,222 $660 Not Implemented
LS2314 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,651 $11,390 Implemented
LS2314 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,291 $89,400 Not Implemented
LS2314 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $40,199 $309,000 Not Implemented
NL0086 # 01 Y:2023 01 2023 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,136 $100,000 n/a
NL0086 # 02 Y:2023 02 2023 INSULATE BARE EQUIPMENT $6,202 $6,211 n/a
NL0086 # 03 Y:2023 03 2023 METER WASTE WATER $4,239 $1,348 n/a
NL0086 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $573 $510 n/a
NL0086 # 05 Y:2023 05 2023 KEEP EQUIPMENT CLEAN $350 $450 n/a
NL0085 # 01 Y:2023 01 2023 ADOPT IN-HOUSE MATERIAL GENERATION $50,849 $76,500 n/a
NL0085 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,711 $26,296 n/a
NL0085 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,403 $10,178 n/a
NL0085 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $808 $25 n/a
NL0085 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $469 $525 n/a
SF0606 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,495 $1,440 Implemented
SF0606 # 02 Y:2023 02 2023 USE MINIMUM STEAM OPERATING PRESSURE $5,475 $60 Implemented
SF0606 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $1,107 $564 Implemented
SF0606 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $5,279 $5,910 Implemented
SF0606 # 05 Y:2023 05 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,502 $8,173 Implemented
SF0606 # 06 Y:2023 06 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $7,028 $31,579 Not Implemented