Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2024 |
Principal Product | Flavored uncarbonated beverage |
NAICS | 311999 - All Other Miscellaneous Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 151,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $3,423,595 | 41,257,744 | kWh | $0.08 |
Electricity Demand | $637,133 | 76,166 | kW-months/year | $8.37 |
Electricity Fees | $1,299 | - | $ | - |
Natural Gas | $534,836 | 241,993 | MMBtu | $2.21 |
TOTAL ENERGY COSTS | $4,596,863 | |||
RECOMMENDED SAVINGS* | $677,314 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $17,306 Cost: $1,250 |
$14,657 | 176,594 | $2,649 | 300 | - | - | - | - |
$14,657 176,594 kWh |
$2,649 300 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $6,623 Cost: $17,500 |
$5,610 | 67,586 | $1,013 | 121 | - | - | - | - |
$5,610 67,586 kWh |
$1,013 121 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1242 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT |
Savings: $37,050 Cost: $110,000 |
- | - | - | - | $13,329 | 6,031 | $23,721 | 2,630 |
- - kWh |
- - kW-months/year |
$13,329 6,031 MMBtu |
$23,721 2,630 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $61,029 Cost: $10,000 |
- | - | - | - | $25,448 | 11,515 | $35,581 | 3,945 |
- - kWh |
- - kW-months/year |
$25,448 11,515 MMBtu |
$35,581 3,945 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT |
Savings: $9,543 Cost: $2,247 |
- | - | - | - | $9,543 | 4,318 | - | - |
- - kWh |
- - kW-months/year |
$9,543 4,318 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $397,405 Cost: $140,000 |
$336,578 | 4,055,152 | $60,827 | 7,267 | - | - | - | - |
$336,578 4,055,152 kWh |
$60,827 7,267 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $61,587 Cost: $28,225 |
$52,160 | 628,435 | $9,427 | 1,126 | - | - | - | - |
$52,160 628,435 kWh |
$9,427 1,126 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $42,185 Cost: $51,431 |
$35,728 | 430,454 | $6,457 | 771 | - | - | - | - |
$35,728 430,454 kWh |
$6,457 771 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $44,586 Cost: $1,934 |
$37,761 | 454,955 | $6,825 | 815 | - | - | - | - |
$37,761 454,955 kWh |
$6,825 815 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $677,314 Cost: $362,587 |
$482,494 | 5,813,176 | $87,198 | 10,400 | $48,320 | 21,864 | $59,302 | 6,575 | $482,494 5,813,176 kWh |
$87,198 10,400 kW-months/year |
$48,320 21,864 MMBtu |
$59,302 6,575 Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Usage | Electricity Usage | Electricity Demand | Natural Gas | Water Usage |