Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,352
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0490 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $440 | $200 | Implemented |
SF0443 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $169,599 | $40,264 | Implemented |
SF0443 # 02 Y:2014 | 02 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,241 | $840 | Not Implemented |
SF0443 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,931 | $0 | Not Implemented |
SF0443 # 04 Y:2014 | 04 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $21,679 | $25,614 | Implemented |
SF0443 # 05 Y:2014 | 05 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $57,826 | $69,335 | Not Implemented |
SF0443 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,897 | $24,840 | Not Implemented |
SF0443 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,886 | $16,744 | Not Implemented |
SF0443 # 08 Y:2014 | 08 | 2014 | INSULATE BARE EQUIPMENT | $9,060 | $45,537 | Not Implemented |
SF0443 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $63,378 | $31,000 | Implemented |
SF0443 # 10 Y:2014 | 10 | 2014 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $11,793 | $50,140 | Not Implemented |
SF0443 # 11 Y:2014 | 11 | 2014 | USE SOLAR HEAT TO MAKE ELECTRICTY | $67,869 | $444,663 | Not Implemented |
SF0429 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $18,109 | $0 | Not Implemented |
SF0429 # 02 Y:2013 | 02 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $578 | $810 | Implemented |
SF0429 # 03 Y:2013 | 03 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,006 | $16,020 | Not Implemented |
SF0429 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $14,210 | $38,634 | Not Implemented |
SF0429 # 05 Y:2013 | 05 | 2013 | USE COMPRESSOR AIR FILTERS | $9,736 | $36,817 | Implemented |
SF0429 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $919 | $5,601 | Implemented |
SF0429 # 07 Y:2013 | 07 | 2013 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,991 | $0 | Not Implemented |
SF0429 # 08 Y:2013 | 08 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $228,512 | $0 | Not Implemented |
SD0465 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $18,166 | $60,710 | Not Implemented |
SD0465 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,606 | $29,550 | Not Implemented |
SD0465 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,054 | $2,000 | Implemented |
SD0465 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,677 | $200 | Implemented |
SD0465 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $1,318 | $1,521 | Not Implemented |