IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,352

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0490 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $440 $200 Implemented
SF0443 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $169,599 $40,264 Implemented
SF0443 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,241 $840 Not Implemented
SF0443 # 03 Y:2014 03 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,931 $0 Not Implemented
SF0443 # 04 Y:2014 04 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,679 $25,614 Implemented
SF0443 # 05 Y:2014 05 2014 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $57,826 $69,335 Not Implemented
SF0443 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,897 $24,840 Not Implemented
SF0443 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,886 $16,744 Not Implemented
SF0443 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $9,060 $45,537 Not Implemented
SF0443 # 09 Y:2014 09 2014 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $63,378 $31,000 Implemented
SF0443 # 10 Y:2014 10 2014 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $11,793 $50,140 Not Implemented
SF0443 # 11 Y:2014 11 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $67,869 $444,663 Not Implemented
SF0429 # 01 Y:2013 01 2013 OPERATE BOILERS ON HIGH FIRE SETTING $18,109 $0 Not Implemented
SF0429 # 02 Y:2013 02 2013 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $578 $810 Implemented
SF0429 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,006 $16,020 Not Implemented
SF0429 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $14,210 $38,634 Not Implemented
SF0429 # 05 Y:2013 05 2013 USE COMPRESSOR AIR FILTERS $9,736 $36,817 Implemented
SF0429 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $919 $5,601 Implemented
SF0429 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,991 $0 Not Implemented
SF0429 # 08 Y:2013 08 2013 RECOVER WASTE HEAT FROM EQUIPMENT $228,512 $0 Not Implemented
SD0465 # 01 Y:2013 01 2013 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $18,166 $60,710 Not Implemented
SD0465 # 02 Y:2013 02 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,606 $29,550 Not Implemented
SD0465 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,054 $2,000 Implemented
SD0465 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,677 $200 Implemented
SD0465 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,318 $1,521 Not Implemented