IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0746 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $32,026 $30,757 Implemented
OK0746 # 02 Y:2007 02 2007 USE SOLAR HEAT FOR HEAT $26,050 $140,000 Not Implemented
OK0746 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $52,302 $14,800 Not Implemented
OK0746 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,580 $4,541 Implemented
OK0746 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,287 $3,000 Implemented
OK0746 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $3,256 Implemented
OK0746 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $0 Implemented
OK0746 # 08 Y:2007 08 2007 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $39,725 $63,500 Not Implemented
OK0746 # 09 Y:2007 09 2007 OPERATE BOILERS ON HIGH FIRE SETTING $49,382 $46,200 Not Implemented
OK0746 # 10 Y:2007 10 2007 OPERATE BOILERS ON HIGH FIRE SETTING $40,383 $400 Not Implemented
OK0746 # 11 Y:2007 11 2007 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $30,387 $15,000 Not Implemented
OK0746 # 12 Y:2007 12 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $24,000 $840,000 Not Implemented
LE0253 # 01 Y:2007 01 2007 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $41,910 $32,000 Implemented
LE0253 # 02 Y:2007 02 2007 ELIMINATE/REDUCE AN OPERATION $40,620 $4,000 Not Implemented
LE0253 # 03 Y:2007 03 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $22,542 $300 Implemented
LE0253 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $20,904 $300 Implemented
LE0253 # 05 Y:2007 05 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $20,819 $37,000 Implemented
LE0253 # 06 Y:2007 06 2007 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $12,436 $15,000 Not Implemented
LE0253 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,186 $1,000 Implemented
LE0253 # 08 Y:2007 08 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,349 $6,200 Implemented
LE0253 # 09 Y:2007 09 2007 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $480 Not Implemented
LE0253 # 10 Y:2007 10 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,672 $2,500 Not Implemented
LE0253 # 11 Y:2007 11 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,980 $510 Not Implemented
LE0253 # 12 Y:2007 12 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $60,000 $100,000 Not Implemented
SF0342 # 01 Y:2007 01 2007 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $250,944 $80,000 Not Implemented