Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0746 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $32,026 | $30,757 | Implemented |
OK0746 # 02 Y:2007 | 02 | 2007 | USE SOLAR HEAT FOR HEAT | $26,050 | $140,000 | Not Implemented |
OK0746 # 03 Y:2007 | 03 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $52,302 | $14,800 | Not Implemented |
OK0746 # 04 Y:2007 | 04 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,580 | $4,541 | Implemented |
OK0746 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,287 | $3,000 | Implemented |
OK0746 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $3,256 | Implemented |
OK0746 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,881 | $0 | Implemented |
OK0746 # 08 Y:2007 | 08 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $39,725 | $63,500 | Not Implemented |
OK0746 # 09 Y:2007 | 09 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $49,382 | $46,200 | Not Implemented |
OK0746 # 10 Y:2007 | 10 | 2007 | OPERATE BOILERS ON HIGH FIRE SETTING | $40,383 | $400 | Not Implemented |
OK0746 # 11 Y:2007 | 11 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $30,387 | $15,000 | Not Implemented |
OK0746 # 12 Y:2007 | 12 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,000 | $840,000 | Not Implemented |
LE0253 # 01 Y:2007 | 01 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $41,910 | $32,000 | Implemented |
LE0253 # 02 Y:2007 | 02 | 2007 | ELIMINATE/REDUCE AN OPERATION | $40,620 | $4,000 | Not Implemented |
LE0253 # 03 Y:2007 | 03 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $22,542 | $300 | Implemented |
LE0253 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $20,904 | $300 | Implemented |
LE0253 # 05 Y:2007 | 05 | 2007 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $20,819 | $37,000 | Implemented |
LE0253 # 06 Y:2007 | 06 | 2007 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,436 | $15,000 | Not Implemented |
LE0253 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,186 | $1,000 | Implemented |
LE0253 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,349 | $6,200 | Implemented |
LE0253 # 09 Y:2007 | 09 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $8,342 | $480 | Not Implemented |
LE0253 # 10 Y:2007 | 10 | 2007 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,672 | $2,500 | Not Implemented |
LE0253 # 11 Y:2007 | 11 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,980 | $510 | Not Implemented |
LE0253 # 12 Y:2007 | 12 | 2007 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $60,000 | $100,000 | Not Implemented |
SF0342 # 01 Y:2007 | 01 | 2007 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $250,944 | $80,000 | Not Implemented |