Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,480

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0589 # 04 Y:2006 04 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $23,960 $0 Implemented
CO0589 # 05 Y:2006 05 2006 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $21,540 $100,800 Not Implemented
CO0589 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $3,910 $32,600 Not Implemented
WI0521 # 01 Y:2006 01 2006 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $222,888 $230,600 Not Implemented
WI0521 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,408 $13,600 Not Implemented
WI0521 # 03 Y:2006 03 2006 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,900 $18,000 Not Implemented
WI0521 # 04 Y:2006 04 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,386 $11,000 Not Implemented
WI0521 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,630 $3,200 Not Implemented
WI0521 # 06 Y:2006 06 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,035 $500 Not Implemented
WI0521 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $630 $0 Not Implemented
OK0735 # 01 Y:2006 01 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $69,788 $55,933 Not Implemented
OK0735 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,821 $9,500 Not Implemented
OK0735 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,625 $4,000 Not Implemented
OK0735 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,193 $12,830 Not Implemented
OK0735 # 05 Y:2006 05 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,240 $700 Not Implemented
SF0330 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,017 $0 Implemented
SF0330 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,235 $117 Not Implemented
SF0330 # 03 Y:2006 03 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,332 $3,710 Not Implemented
SF0330 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,266 $20,534 Not Implemented
SF0330 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $2,860 $4,608 Not Implemented
SF0330 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $14,161 $39,154 Not Implemented
SF0330 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,694 $33,264 Not Implemented
SF0330 # 08 Y:2006 08 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $7,608 Not Implemented
SD0385 # 01 Y:2006 01 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $273,018 $135,000 Not Implemented
SD0385 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,090 $17,767 Implemented