Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2102 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,049 | $0 | Implemented |
UU0179 # 01 Y:2021 | 01 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $72,600 | $4,000 | Not Implemented |
UU0179 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $27,935 | $2,000 | Implemented |
UU0179 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,891 | $1,233 | Not Implemented |
UU0179 # 04 Y:2021 | 04 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,472 | $8,300 | Not Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |
UU0179 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $6,614 | Implemented |
UU0179 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $617 | $50 | Not Implemented |
UU0179 # 08 Y:2021 | 08 | 2021 | INSULATE BARE EQUIPMENT | $345 | $747 | Not Implemented |
DL0187 # 01 Y:2021 | 01 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,390 | $0 | Implemented |
DL0187 # 02 Y:2021 | 02 | 2021 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $13,620 | $0 | Implemented |
DL0187 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,480 | $4,900 | Not Implemented |
DL0187 # 04 Y:2021 | 04 | 2021 | UPGRADE CONTROLS ON COMPRESSORS | $596 | $1,200 | Not Implemented |
DL0187 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,940 | $5,000 | Implemented |
DL0187 # 06 Y:2021 | 06 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,370 | $6,500 | Not Implemented |
DL0187 # 07 Y:2021 | 07 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,400 | $9,500 | Not Implemented |
DL0187 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $52,324 | $119,348 | Not Implemented |
DL0187 # 09 Y:2021 | 09 | 2021 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $797 | $4,000 | Not Implemented |
DL0187 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,153 | $1,574 | Implemented |
LE0499 # 01 Y:2021 | 01 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $60,388 | $0 | Implemented |
LE0499 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $69,561 | $53,200 | Not Implemented |
LE0499 # 03 Y:2021 | 03 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,216 | $57,400 | Not Implemented |
LE0499 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,271 | $5,600 | Implemented |
SD0601 # 01 Y:2020 | 01 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $714 | $1,555 | Implemented |
SD0601 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $295 | $504 | Implemented |