IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,562

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0238 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $83 Not Implemented
IC0238 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $979 $240 Not Implemented
AS0484 # 01 Y:2020 01 2020 Install Anaerobic Digester $1,259,928 $10,007,562 Implemented
AS0484 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,233 $231,375 Not Implemented
AS0484 # 03 Y:2020 03 2020 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $26,610 $79,200 Implemented
AS0484 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,035 $5,600 Not Implemented
IC0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,797 $2,350 Not Implemented
IC0237 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,993 $2,764 Not Implemented
IC0237 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,125 $0 Not Implemented
IC0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,251 $2,864 Not Implemented
IC0237 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,275 $177 Not Implemented
IC0237 # 06 Y:2020 06 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $817 $1,111 Not Implemented
IC0237 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $628 $200 Not Implemented
MI0371 # 01 Y:2020 01 2020 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $9,343 $7,557 Implemented
MI0371 # 02 Y:2020 02 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,462 $820 Implemented
MI0371 # 03 Y:2020 03 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,458 $5,640 Implemented
MI0371 # 04 Y:2020 04 2020 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,708 $1,275 Implemented
MI0371 # 05 Y:2020 05 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,638 $2,460 Implemented
MI0371 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $473 $325 Implemented
MI0371 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $210 $407 Implemented
IP0133 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $1,574 $343 Not Implemented
IP0133 # 02 Y:2020 02 2020 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $2,073 $1,218 Not Implemented
IP0133 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,033 $14,189 Not Implemented
IP0133 # 04 Y:2020 04 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $618 $553 Not Implemented
IP0133 # 05 Y:2020 05 2020 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,196 $4,991 Not Implemented