Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,562
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0519 # 09 Y:2018 | 09 | 2018 | RECYCLE WHITE WATER | $16,021 | $7,759 | Not Implemented |
LS1806 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $168 | $100 | Not Implemented |
LS1806 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $11 | $9 | Not Implemented |
LS1806 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,834 | $13,581 | Not Implemented |
LS1806 # 04 Y:2018 | 04 | 2018 | CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING | $1,519 | $6,300 | Not Implemented |
SU0458 # 01 Y:2018 | 01 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $244 | $0 | Not Implemented |
SU0458 # 02 Y:2018 | 02 | 2018 | BURN A LESS EXPENSIVE GRADE OF FUEL | $213,044 | $120,000 | Implemented |
SU0458 # 03 Y:2018 | 03 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $206 | $168 | Not Implemented |
SU0458 # 04 Y:2018 | 04 | 2018 | REPLACE BOILER | $101,732 | $175,000 | Implemented |
SU0458 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $146 | Implemented |
SU0458 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $258 | Implemented |
SU0458 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $189 | $580 | Not Implemented |
MA0788 # 01 Y:2018 | 01 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $98,644 | $110,000 | Implemented |
MA0788 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,627 | $17,006 | Implemented |
MA0788 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,698 | $116,889 | Not Implemented |
MA0788 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,164 | $6,660 | Not Implemented |
MA0788 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $4,116 | $10,462 | Implemented |
MA0788 # 06 Y:2018 | 06 | 2018 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,493 | $1,750 | Implemented |
MA0788 # 07 Y:2018 | 07 | 2018 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,043 | $18,200 | Not Implemented |
AM0749 # 01 Y:2018 | 01 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $136,440 | $167,100 | Not Implemented |
AM0749 # 02 Y:2018 | 02 | 2018 | COMBINE UTILITY METERS | $65,915 | $10,000 | Not Implemented |
AM0749 # 03 Y:2018 | 03 | 2018 | OPTIMIZE PLANT POWER FACTOR | $31,797 | $45,252 | Not Implemented |
AM0749 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,000 | $15,400 | Not Implemented |
AM0749 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,165 | $40 | Not Implemented |
AM0749 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $9,336 | $1,560 | Not Implemented |