Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0264 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,905 | $7,317 | n/a |
UU0264 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $44,517 | $717,537 | n/a |
UU0264 # 05 Y:2025 | 05 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,332 | $4,000 | n/a |
UU0264 # 08 Y:2025 | 08 | 2025 | INSTALL OCCUPANCY SENSORS | $538 | $1,531 | n/a |
UU0264 # 02 Y:2025 | 02 | 2025 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $215,672 | $730,950 | n/a |
UU0264 # 10 Y:2025 | 10 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $515 | $916 | n/a |
UU0264 # 03 Y:2025 | 03 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $729,671 | $3,645,455 | n/a |
UU0264 # 11 Y:2025 | 11 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $44,506 | $432,000 | n/a |
UU0264 # 04 Y:2025 | 04 | 2025 | REPLACE BOILER | $379,077 | $4,080,441 | n/a |
UU0264 # 01 Y:2025 | 01 | 2025 | INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM | $79,422 | $143,652 | n/a |
UU0264 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,405 | $8,915 | n/a |
UU0235 # 02 Y:2024 | 02 | 2024 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $271,861 | $3,050,000 | Not Implemented |
UU0235 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,664 | $1,013 | Implemented |
UU0235 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,478 | $23,282 | Not Implemented |
UU0235 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $6,968 | $8,826 | Not Implemented |
UU0236 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $72,320 | $46,000 | Implemented |
UU0236 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $5,640 | $3,090 | Implemented |
UU0236 # 01 Y:2024 | 01 | 2024 | REPLACE BOILER | $208,300 | $1,070,720 | Implemented |
UU0236 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $16,698 | $11,570 | Implemented |
UU0224 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,006 | $10,650 | Implemented |
UU0224 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,460 | $1,382 | Implemented |
UU0224 # 05 Y:2023 | 05 | 2023 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,224 | $4,500 | Not Implemented |
UU0224 # 04 Y:2023 | 04 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,361 | $1,485 | Implemented |
UU0224 # 02 Y:2023 | 02 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,206 | $7,560 | Implemented |
UU0224 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,006 | $51 | Implemented |