Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
554
matching recommendationsNAICS | 311 | Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8417 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $0 | n/a |
LT8417 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,056 | $0 | n/a |
LT8417 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,666 | $39,130 | n/a |
LT8417 # 03 Y:2024 | 03 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,894 | $485,500 | n/a |
LS2501 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $71,253 | $442,396 | n/a |
LS2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $536 | $90 | n/a |
LS2501 # 01 Y:2025 | 01 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $2,529 | $0 | n/a |
LS2501 # 03 Y:2025 | 03 | 2025 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $12,000 | $10,000 | n/a |
LS2421 # 04 Y:2024 | 04 | 2024 | INSTALL WIND POWERED ELECTRIC GENERATOR | $148,851 | $560,000 | n/a |
LS2421 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $8,504 | $12,500 | n/a |
LS2421 # 01 Y:2024 | 01 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $33,742 | $15,900 | n/a |
LS2421 # 03 Y:2024 | 03 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $590,512 | $783,539 | n/a |
LS2421 # 05 Y:2024 | 05 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $21,228 | $141,000 | n/a |
LS2418 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,563 | $135 | n/a |
LS2418 # 04 Y:2024 | 04 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $627 | $165 | n/a |
LS2418 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,302 | $200 | n/a |
LS2418 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,367 | $514,800 | n/a |
LS2418 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $182,554 | $481,830 | n/a |
LS2418 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,114 | $50 | n/a |
LS2413 # 02 Y:2024 | 02 | 2024 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $5,076 | $16,000 | Implemented |
LS2413 # 01 Y:2024 | 01 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $68,225 | $155,400 | Implemented |
LS2413 # 03 Y:2024 | 03 | 2024 | INSTALL SENSORS TO DETECT DEFECTS | $5,700 | $30,000 | Not Implemented |
LS2412 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $872 | $135 | Implemented |
LS2412 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,854 | $5,915 | Implemented |
LS2412 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,703 | $150 | Not Implemented |