IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0841 # 05 Y:2022 05 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,033 $7,500 Not Implemented
MA0841 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,138 $8,830 Implemented
MA0841 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,842 $500 Implemented
MA0841 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $24,631 $155,407 Implemented
MA0841 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $253 $234 Implemented
MA0841 # 03 Y:2022 03 2022 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $9,761 $49,341 Implemented
MA0809 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,036 $3,057 Implemented
MA0809 # 03 Y:2019 03 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $2,332 $150 Implemented
MA0809 # 05 Y:2019 05 2019 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,114 $4,500 Implemented
MA0809 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $7,376 $23,715 Not Implemented
MA0809 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,745 $11,800 Not Implemented
MA0809 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,772 $1,000 Implemented
MA0788 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $4,116 $10,462 Implemented
MA0788 # 07 Y:2018 07 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,043 $18,200 Not Implemented
MA0788 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,164 $6,660 Not Implemented
MA0788 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $3,493 $1,750 Implemented
MA0788 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,698 $116,889 Not Implemented
MA0788 # 01 Y:2018 01 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $98,644 $110,000 Implemented
MA0788 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,627 $17,006 Implemented
MA0761 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,889 $2,685 Not Implemented
MA0761 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $3,035 $4,050 Not Implemented
MA0761 # 05 Y:2016 05 2016 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $864 $342 Not Implemented
MA0761 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $816 $2,000 Not Implemented
MA0761 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,969 $6,409 Not Implemented
MA0761 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,997 $134,000 Not Implemented