IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

120

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0087 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $254,315 $454,461 n/a
NL0087 # 05 Y:2023 05 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,616 $7,640 n/a
NL0087 # 04 Y:2023 04 2023 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,625 $8,000 n/a
NL0087 # 08 Y:2023 08 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,019 $768 n/a
NL0087 # 01 Y:2023 01 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $491,419 $1,990,800 n/a
NL0087 # 03 Y:2023 03 2023 REPAIR OR REPLACE STEAM TRAPS $17,666 $50 n/a
NL0087 # 06 Y:2023 06 2023 RECOVER AND REUSE WASTE MATERIAL $10,817 $3,660 n/a
NL0087 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,789 $100 n/a
IA0535 # 02 Y:2015 02 2015 ADJUST BURNERS FOR EFFICIENT OPERATION $845 $3,200 Not Implemented
IA0535 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $552 $1,391 Not Implemented
IA0535 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,967 $2,059 Implemented
IA0535 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,091 $70 Implemented
IA0535 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,318 $3,120 Implemented
IA0535 # 06 Y:2015 06 2015 INSTALL OCCUPANCY SENSORS $466 $710 Implemented
IA0535 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,020 $10,595 Implemented
IA0522 # 07 Y:2014 07 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $524 $405 Not Implemented
IA0522 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,013 $2,648 Not Implemented
IA0522 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $488 $1,045 Not Implemented
IA0522 # 05 Y:2014 05 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $6,365 $525 Not Implemented
IA0522 # 02 Y:2014 02 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,680 $7,327 Not Implemented
IA0522 # 06 Y:2014 06 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,589 $35 Not Implemented
IA0522 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,915 $89,600 Implemented
IA0516 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $10,277 Implemented
IA0516 # 06 Y:2014 06 2014 USE PHOTOCELL CONTROLS $307 $1,035 Not Implemented
IA0516 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $1,138 $1,530 Not Implemented