IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

353

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0551 # 03 Y:2023 03 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $111,339 $525,000 Implemented
LE0551 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $69,768 $5,000 Implemented
LE0551 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $203 $300 Not Implemented
LE0536 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,974 $35,815 Implemented
LE0536 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,036 $2,440 Implemented
LE0536 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,791 $0 Implemented
LE0536 # 04 Y:2023 04 2023 PREHEAT COMBUSTION AIR WITH WASTE HEAT $28,034 $80,000 Not Implemented
LE0536 # 05 Y:2023 05 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,556 $15,000 Not Implemented
LE0536 # 06 Y:2023 06 2023 ELIMINATE A BY-PRODUCT $188,025 $700,000 Not Implemented
LE0536 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $52,147 $200,000 Not Implemented
LE0532 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,896 $15,000 Not Implemented
LE0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,393 $5,160 Not Implemented
LE0532 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,125 $80,000 Not Implemented
LE0532 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,119 $460 Not Implemented
LE0532 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,992 $200,000 Not Implemented
LE0532 # 06 Y:2022 06 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,155 $99,432 Not Implemented
LE0532 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $1,087 $0 Not Implemented
LE0513 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,214 $1,500 Not Implemented
LE0513 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,170 $9,500 Not Implemented
LE0513 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $362 $1,250 Not Implemented
LE0513 # 03 Y:2021 03 2021 USE OPTIMUM TEMPERATURE $1,846 $2,500 Not Implemented
LE0513 # 06 Y:2021 06 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,313 $22,000 Not Implemented
LE0513 # 02 Y:2021 02 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $1,500 Not Implemented
LE0506 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,000 Not Implemented
LE0506 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,239 $800,000 Not Implemented