Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
649
matching recommendationsNAICS | 3112 | Grain and Oilseed Milling |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8417 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,666 | $39,130 | n/a |
LT8417 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $0 | n/a |
LT8417 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,056 | $0 | n/a |
LT8417 # 03 Y:2024 | 03 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,894 | $485,500 | n/a |
MZ0370 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $6,915 | $4,560 | n/a |
MZ0370 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,634 | $22,593 | n/a |
MZ0370 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,031 | $3,941 | n/a |
MZ0370 # 05 Y:2025 | 05 | 2025 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,132 | $200 | n/a |
MZ0370 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,013 | $1,000 | n/a |
MZ0370 # 07 Y:2025 | 07 | 2025 | INSULATE BARE EQUIPMENT | $883 | $418 | n/a |
MZ0370 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,914 | $12,624 | n/a |
LS2418 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,114 | $50 | n/a |
LS2418 # 04 Y:2024 | 04 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $627 | $165 | n/a |
LS2418 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,302 | $200 | n/a |
LS2418 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,563 | $135 | n/a |
LS2418 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,367 | $514,800 | n/a |
LS2418 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $182,554 | $481,830 | n/a |
LE0562 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,612 | $350 | Implemented |
LE0562 # 04 Y:2024 | 04 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,836 | $5,000 | Not Implemented |
LE0562 # 07 Y:2024 | 07 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,491 | $8,000 | Implemented |
LE0562 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,738 | $13,669 | Not Implemented |
LE0562 # 08 Y:2024 | 08 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,989 | $60,600 | Not Implemented |
LE0562 # 05 Y:2024 | 05 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $727 | $1,000 | Implemented |
LE0562 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,513 | $320 | Implemented |
LE0562 # 03 Y:2024 | 03 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,865 | $27,000 | Not Implemented |