Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 3112 | Grain and Oilseed Milling |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2418 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $38,367 | $514,800 | n/a |
LS2418 # 05 Y:2024 | 05 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $182,554 | $481,830 | n/a |
LS2418 # 04 Y:2024 | 04 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $627 | $165 | n/a |
LS2418 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,563 | $135 | n/a |
LS2418 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,302 | $200 | n/a |
LS2418 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,114 | $50 | n/a |
LE0562 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,612 | $350 | n/a |
LE0562 # 08 Y:2024 | 08 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,989 | $60,600 | n/a |
LE0562 # 07 Y:2024 | 07 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,491 | $8,000 | n/a |
LE0562 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,738 | $13,669 | n/a |
LE0562 # 05 Y:2024 | 05 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $727 | $1,000 | n/a |
LE0562 # 04 Y:2024 | 04 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,836 | $5,000 | n/a |
LE0562 # 03 Y:2024 | 03 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,865 | $27,000 | n/a |
LE0562 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,513 | $320 | n/a |
DL0230 # 01 Y:2024 | 01 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $13,779 | $15,504 | n/a |
DL0230 # 02 Y:2024 | 02 | 2024 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $44,058 | $22,437 | n/a |
DL0230 # 03 Y:2024 | 03 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $100,915 | $74,000 | n/a |
DL0230 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,146 | $2,040 | n/a |
DL0230 # 05 Y:2024 | 05 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $11,418 | $0 | n/a |
DL0230 # 06 Y:2024 | 06 | 2024 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $15,141 | $10,000 | n/a |
DL0230 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,919 | $2,200 | n/a |