IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

316

matching recommendations
Reset
NAICS 31121 Flour Milling and Malt Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0318 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,034 $9,660 Implemented
MI0318 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,714 $1,660 Implemented
MI0318 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $21,088 $106,884 Not Implemented
MI0318 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,550 $39,636 Implemented
MI0318 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $60,626 $3,600 Implemented
MI0318 # 08 Y:2017 08 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,591 $4,940 Implemented
IA0549 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,365 $16,877 Implemented
IA0549 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,832 $20,111 Implemented
IA0549 # 03 Y:2016 03 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,200 $700 Not Implemented
IA0549 # 04 Y:2016 04 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,000 $704 Not Implemented
IA0549 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,708 $593 Implemented
IA0549 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,395 $70 Not Implemented
IA0549 # 07 Y:2016 07 2016 DIRECT WARMEST AIR TO COMBUSTION INTAKE $900 $300 Not Implemented
IA0549 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $837 $300 Not Implemented
IA0549 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $329 $1,151 Implemented
OR0629 # 01 Y:2014 01 2014 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $37,907 $21,000 Implemented
OR0629 # 02 Y:2014 02 2014 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $37,863 $38,930 Not Implemented
OR0629 # 03 Y:2014 03 2014 RECOVER AND REUSE COOLING WATER $58,681 $3,764 Implemented
OR0629 # 04 Y:2014 04 2014 REPLACE BOILER $523,306 $3,403,664 Implemented
IP0022 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $706 $1,711 Not Implemented
IP0022 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $870 $1,590 Implemented
IP0022 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,458 $2,226 Not Implemented
IP0022 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,308 $3,528 Implemented
IP0022 # 04 Y:2014 04 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,868 $2,394 Not Implemented
IP0022 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $631 $212 Not Implemented