Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsNAICS | 311213 | Malt Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0777 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,570 | $0 | Implemented |
OR0777 # 02 Y:2023 | 02 | 2023 | INSTALL COMMON HEADER ON COMPRESSORS | $2,832 | $6,989 | Implemented |
OR0777 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,479 | $0 | Implemented |
AS0526 # 02 Y:2022 | 02 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,336 | $650 | Implemented |
AS0526 # 01 Y:2022 | 01 | 2022 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,135 | $500 | Implemented |
AS0526 # 04 Y:2022 | 04 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $368 | $200 | Implemented |
AS0526 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $598 | $1,116 | Not Implemented |
BS0153 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,134 | $5,961 | Not Implemented |
BS0153 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $733 | $490 | Not Implemented |
BS0153 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $98,310 | $307,800 | Not Implemented |
BS0153 # 01 Y:2021 | 01 | 2021 | INSTALL OCCUPANCY SENSORS | $30,759 | $3,726 | Not Implemented |
CL2102 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,814 | $3,180 | Implemented |
CL2102 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $322 | $453 | Not Implemented |
CL2102 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,176 | $2,846 | Implemented |
CL2102 # 04 Y:2021 | 04 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,049 | $0 | Implemented |
OR0629 # 02 Y:2014 | 02 | 2014 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $37,863 | $38,930 | Not Implemented |
OR0629 # 03 Y:2014 | 03 | 2014 | RECOVER AND REUSE COOLING WATER | $58,681 | $3,764 | Implemented |
OR0629 # 04 Y:2014 | 04 | 2014 | REPLACE BOILER | $523,306 | $3,403,664 | Implemented |
OR0629 # 01 Y:2014 | 01 | 2014 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $37,907 | $21,000 | Implemented |
WI0521 # 01 Y:2006 | 01 | 2006 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $222,888 | $230,600 | Not Implemented |
WI0521 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,408 | $13,600 | Not Implemented |
WI0521 # 03 Y:2006 | 03 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $6,900 | $18,000 | Not Implemented |
WI0521 # 04 Y:2006 | 04 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,386 | $11,000 | Not Implemented |
WI0521 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,630 | $3,200 | Not Implemented |
WI0521 # 06 Y:2006 | 06 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,035 | $500 | Not Implemented |