IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

191

matching recommendations
Reset
NAICS 31122 Starch and Vegetable Fats and Oils Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0530 # 08 Y:2018 08 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $97,224 $532,260 Not Implemented
SF0530 # 01 Y:2018 01 2018 INSTALL TIMERS AND/OR THERMOSTATS $6,177 $2,407 Implemented
SF0530 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,808 $97,552 Implemented
SF0530 # 02 Y:2018 02 2018 UPGRADE CONTROLS ON COMPRESSORS $13,070 $22,633 Implemented
NL0020 # 04 Y:2018 04 2018 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $81 $200 Implemented
NL0020 # 03 Y:2018 03 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $543 $2,476 Not Implemented
NL0020 # 02 Y:2018 02 2018 AIR CONDITION ONLY SPACE NECESSARY $1,869 $56 Implemented
NL0020 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,414 $29,401 Implemented
SF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,172 $20,431 Not Implemented
SF0508 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,154 $0 Implemented
SF0508 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,198 $2,023 Implemented
SF0508 # 03 Y:2017 03 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $640 $553 Not Implemented
SF0508 # 06 Y:2017 06 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,181 $6,155 Not Implemented
SF0508 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,954 $26,825 Implemented
IP0087 # 08 Y:2017 08 2017 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $509 $529 Not Implemented
IP0087 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $332 $798 Implemented
IP0087 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,313 $7,280 Implemented
IP0087 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,139 $432 Implemented
IP0087 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,213 $2,430 Implemented
IP0087 # 10 Y:2017 10 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $606,139 $2,150,000 Not Implemented
IP0087 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $3,851 $308 Not Implemented
IP0087 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,755 $189 Not Implemented
IP0087 # 01 Y:2017 01 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,035 $0 Not Implemented
IP0087 # 02 Y:2017 02 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $23,755 $72 Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented