IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
Reset
NAICS 311340 Nonchocolate Confectionery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0217 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,807 $8,910 Implemented
UU0217 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,013 $1,020 Implemented
UU0217 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,794 $5,550 Not Implemented
UU0217 # 01 Y:2023 01 2023 Install Anaerobic Digester $648,030 $7,400,000 Implemented
UU0217 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,500 $51,330 Implemented
CM1010 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,190 $17,940 n/a
CM1010 # 06 Y:2022 06 2022 IMPROVE HANDLING PRACTICES $1,056 $9,800 n/a
CM1010 # 05 Y:2022 05 2022 INCREASE EFFICIENCY OF TRUCKS $6,350 $48,100 n/a
CM1010 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $14,400 $0 n/a
CM1010 # 04 Y:2022 04 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,500 $12,400 n/a
CM1010 # 03 Y:2022 03 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $101,930 $41,000 n/a
CM1010 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $54,241 $557,400 n/a
IC0237 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,797 $2,350 Not Implemented
IC0237 # 02 Y:2020 02 2020 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,993 $2,764 Not Implemented
IC0237 # 06 Y:2020 06 2020 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $817 $1,111 Not Implemented
IC0237 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $628 $200 Not Implemented
IC0237 # 03 Y:2020 03 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,125 $0 Not Implemented
IC0237 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,251 $2,864 Not Implemented
IC0237 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,275 $177 Not Implemented
OR0652 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,000 $15,000 Not Implemented
OR0652 # 01 Y:2015 01 2015 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $7,000 $54,000 Not Implemented
OR0652 # 03 Y:2015 03 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,990 $0 Not Implemented
OR0652 # 04 Y:2015 04 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $6,390 $51,745 Not Implemented
OR0652 # 02 Y:2015 02 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,010 $2,900 Not Implemented
DL0138 # 06 Y:2015 06 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,465 $650 Not Implemented