IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

243

matching recommendations
Reset
NAICS 31135 Chocolate and Confectionery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0713 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,400 $18,930 n/a
CO0713 # 01 Y:2015 01 2015 AVOID FROST FORMATION ON EVAPORATORS $4,350 $5,740 n/a
BS0019 # 10 Y:2013 10 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $142 $551 Implemented
BS0019 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $165 $120 Implemented
BS0019 # 08 Y:2013 08 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $310 $25 Not Implemented
BS0019 # 07 Y:2013 07 2013 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $23 $25 Implemented
BS0019 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $197 $349 Implemented
BS0019 # 05 Y:2013 05 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47 $36 Implemented
BS0019 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $41 $81 Implemented
BS0019 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $84 $157 Not Implemented
BS0019 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $349 Implemented
BS0019 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $187 $364 Not Implemented
DL0101 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,700 $19,110 Not Implemented
DL0101 # 01 Y:2013 01 2013 CLOSE OFF UNNEEDED STEAM LINES $5,097 $225 Not Implemented
DL0101 # 02 Y:2013 02 2013 USE OPTIMUM THICKNESS INSULATION $7,200 $432 Not Implemented
DL0101 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $51,000 $130,000 Not Implemented
DL0101 # 04 Y:2013 04 2013 REPLACE BOILER $16,867 $28,062 Not Implemented
DL0101 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $7,100 $22,500 Not Implemented
DL0101 # 08 Y:2013 08 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,800 $0 Not Implemented
DL0101 # 05 Y:2013 05 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,900 $3,500 Not Implemented
SF0406 # 09 Y:2012 09 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,696 $10,439 Not Implemented
SF0406 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $4,954 $21,408 Not Implemented
SF0406 # 08 Y:2012 08 2012 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $25,304 $93,999 Not Implemented
SF0406 # 07 Y:2012 07 2012 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $90,076 $288,023 Not Implemented
SF0406 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,401 $0 Implemented