IAC Assessment: DL0101
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0101
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2013
Principal Product Cocoa Products
NAICS 311351 - Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2066 - Chocolate And Cocoa Products
Sales >$500,000,000
# of Employees 50
Plant Area (Sq.Ft.) 150,000
Annual Production 2,147,483,647 Units
Production Hrs. Annual 8,760
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,608 1,175,079 kWh $0.11
Natural Gas $171,009 17,919 MMBtu $9.54
TOTAL ENERGY COSTS $302,617
RECOMMENDED SAVINGS* $100,664 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$5,097
Cost:
$225
- - $5,097 - - - -
-
kWh
$5,097
-
$
-
-
MMBtu
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$7,200
Cost:
$432
- - - - $7,200 757 -
-
kWh
-
-
$
$7,200
757
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$51,000
Cost:
$130,000
- - - - $51,000 5,350 -
-
kWh
-
-
$
$51,000
5,350
MMBtu
04: 2.1224 REPLACE BOILER Savings:
$16,867
Cost:
$28,062
- - - - $16,867 1,767 -
-
kWh
-
-
$
$16,867
1,767
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,900
Cost:
$3,500
- - - - $1,900 200 -
-
kWh
-
-
$
$1,900
200
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,700
Cost:
$19,110
$5,700 51,000 - - - - $5,700
51,000
kWh
-
-
$
-
-
MMBtu
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$7,100
Cost:
$22,500
$7,100 63,100 - - - - $7,100
63,100
kWh
-
-
$
-
-
MMBtu
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,800
Cost:
-
$5,800 51,800 - - - - $5,800
51,800
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,664
Cost:
$203,829
$18,600 165,900 $5,097 - $76,967 8,074 $18,600
165,900
kWh
$5,097
-
$
$76,967
8,074
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas