IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
NAICS 311351 Chocolate and Confectionery Manufacturing from Cacao Beans
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0572 # 08 Y:2021 08 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $343,451 $2,394,442 Not Implemented
SF0572 # 07 Y:2021 07 2021 REPLACE BOILER $14,321 $72,000 Not Implemented
SF0572 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $332 $67 Not Implemented
SF0572 # 06 Y:2021 06 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,350 $4,996 Not Implemented
SF0572 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,961 $45,208 Not Implemented
SF0572 # 04 Y:2021 04 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,236 $25,695 Not Implemented
SF0572 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,781 $1,200 Implemented
SF0572 # 10 Y:2021 10 2021 INSTALL SUB-METERING EQUIPMENT $8,446 $6,896 Implemented
SF0572 # 09 Y:2021 09 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $134,491 $56,667 Not Implemented
SF0572 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,373 $200 Implemented
SF0385 # 13 Y:2010 13 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,444 $7,188 Not Implemented
SF0385 # 11 Y:2010 11 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $97,444 $119,566 Not Implemented
SF0385 # 09 Y:2010 09 2010 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $640 $633 Implemented
SF0385 # 08 Y:2010 08 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $187 $154 Not Implemented
SF0385 # 07 Y:2010 07 2010 INSULATE BARE EQUIPMENT $1,608 $750 Implemented
SF0385 # 14 Y:2010 14 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $24,082 $12,770 Implemented
SF0385 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,533 $20,000 Not Implemented
SF0385 # 03 Y:2010 03 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $23,195 $1,760 Implemented
SF0385 # 17 Y:2010 17 2010 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $57,997 $240,000 Not Implemented
SF0385 # 18 Y:2010 18 2010 USE OPTIMUM THICKNESS INSULATION $36,228 $325,369 Implemented
SF0385 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,270 $0 Implemented
SF0385 # 16 Y:2010 16 2010 OPTIMIZE PLANT POWER FACTOR $9,677 $23,715 Implemented
SF0385 # 04 Y:2010 04 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,136 $373 Not Implemented
SF0385 # 06 Y:2010 06 2010 USE PHOTOCELL CONTROLS $14,856 $6,800 Implemented
SF0385 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,418 $0 Implemented