Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsNAICS | 311351 | Chocolate and Confectionery Manufacturing from Cacao Beans |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0572 # 08 Y:2021 | 08 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $343,451 | $2,394,442 | Not Implemented |
SF0572 # 07 Y:2021 | 07 | 2021 | REPLACE BOILER | $14,321 | $72,000 | Not Implemented |
SF0572 # 03 Y:2021 | 03 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $332 | $67 | Not Implemented |
SF0572 # 06 Y:2021 | 06 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,350 | $4,996 | Not Implemented |
SF0572 # 05 Y:2021 | 05 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $46,961 | $45,208 | Not Implemented |
SF0572 # 04 Y:2021 | 04 | 2021 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $33,236 | $25,695 | Not Implemented |
SF0572 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,781 | $1,200 | Implemented |
SF0572 # 10 Y:2021 | 10 | 2021 | INSTALL SUB-METERING EQUIPMENT | $8,446 | $6,896 | Implemented |
SF0572 # 09 Y:2021 | 09 | 2021 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $134,491 | $56,667 | Not Implemented |
SF0572 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,373 | $200 | Implemented |
SF0385 # 13 Y:2010 | 13 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $7,188 | Not Implemented |
SF0385 # 11 Y:2010 | 11 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $97,444 | $119,566 | Not Implemented |
SF0385 # 09 Y:2010 | 09 | 2010 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $640 | $633 | Implemented |
SF0385 # 08 Y:2010 | 08 | 2010 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $187 | $154 | Not Implemented |
SF0385 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $1,608 | $750 | Implemented |
SF0385 # 14 Y:2010 | 14 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $24,082 | $12,770 | Implemented |
SF0385 # 12 Y:2010 | 12 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,533 | $20,000 | Not Implemented |
SF0385 # 03 Y:2010 | 03 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $23,195 | $1,760 | Implemented |
SF0385 # 17 Y:2010 | 17 | 2010 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $57,997 | $240,000 | Not Implemented |
SF0385 # 18 Y:2010 | 18 | 2010 | USE OPTIMUM THICKNESS INSULATION | $36,228 | $325,369 | Implemented |
SF0385 # 02 Y:2010 | 02 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,270 | $0 | Implemented |
SF0385 # 16 Y:2010 | 16 | 2010 | OPTIMIZE PLANT POWER FACTOR | $9,677 | $23,715 | Implemented |
SF0385 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,136 | $373 | Not Implemented |
SF0385 # 06 Y:2010 | 06 | 2010 | USE PHOTOCELL CONTROLS | $14,856 | $6,800 | Implemented |
SF0385 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,418 | $0 | Implemented |