Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Francisco State University |
---|---|
Assessment Year | 2010 |
Principal Product | Chocolate |
NAICS | 311351 - Chocolate and Confectionery Manufacturing from Cacao Beans |
SIC | 2066 - Chocolate And Cocoa Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 60,000,000 Pounds |
Production Hrs. Annual | 8,232 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $909,705 | 9,888,254 | kWh | $0.09 |
Electricity Demand | $363,567 | 24,880 | kW-months/year | $14.61 |
Electricity Fees | $17,434 | - | $ | - |
Natural Gas | $242,962 | 34,221 | MMBtu | $7.10 |
TOTAL ENERGY COSTS | $1,533,668 | |||
RECOMMENDED SAVINGS* | $320,686 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $131,240 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,418 Cost: - |
$3,418 | 35,982 | - | - | - | - | - | - |
$3,418 35,982 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $12,270 Cost: - |
- | - | - | - | - | - | $12,270 | 1,728 |
- - kWh |
- - kW-months/year |
- - $ |
$12,270 1,728 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $23,195 Cost: $1,760 |
- | - | - | - | - | - | $23,195 | 3,266 |
- - kWh |
- - kW-months/year |
- - $ |
$23,195 3,266 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,136 Cost: $373 |
$1,604 | 16,745 | $532 | 36 | - | - | - | - |
$1,604 16,745 kWh |
$532 36 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $4,350 Cost: $771 |
$4,350 | 45,795 | - | - | - | - | - | - |
$4,350 45,795 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $14,856 Cost: $6,800 |
$10,346 | 107,879 | $4,510 | 300 | - | - | - | - |
$10,346 107,879 kWh |
$4,510 300 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,608 Cost: $750 |
- | - | - | - | - | - | $1,608 | 227 |
- - kWh |
- - kW-months/year |
- - $ |
$1,608 227 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS |
Savings: $187 Cost: $154 |
$152 | 1,581 | $35 | 2 | - | - | - | - |
$152 1,581 kWh |
$35 2 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM |
Savings: $640 Cost: $633 |
$255 | 2,685 | $385 | 24 | - | - | - | - |
$255 2,685 kWh |
$385 24 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,266 Cost: $5,951 |
$3,871 | 40,369 | $1,395 | 96 | - | - | - | - |
$3,871 40,369 kWh |
$1,395 96 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $97,444 Cost: $119,566 |
$77,018 | 803,106 | $20,426 | 1,344 | - | - | - | - |
$77,018 803,106 kWh |
$20,426 1,344 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $15,533 Cost: $20,000 |
$3,263 | 34,344 | - | - | - | - | $12,270 | 1,728 |
$3,263 34,344 kWh |
- - kW-months/year |
- - $ |
$12,270 1,728 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,444 Cost: $7,188 |
$3,444 | 36,248 | - | - | - | - | - | - |
$3,444 36,248 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $24,082 Cost: $12,770 |
$18,590 | 193,849 | $5,492 | 360 | - | - | - | - |
$18,590 193,849 kWh |
$5,492 360 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,355 Cost: $18,588 |
$6,466 | 67,427 | $1,889 | 120 | - | - | - | - |
$6,466 67,427 kWh |
$1,889 120 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,677 Cost: $23,715 |
- | - | - | - | $9,677 | - | - | - |
- - kWh |
- - kW-months/year |
$9,677 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.3321 USE STEAM PRESSURE REDUCTION TO GENERATE POWER |
Savings: $57,997 Cost: $240,000 |
$47,010 | 494,847 | $10,987 | 720 | - | - | - | - |
$47,010 494,847 kWh |
$10,987 720 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $36,228 Cost: $325,369 |
$2,234 | 23,290 | $518 | 36 | - | - | $33,476 | 4,715 |
$2,234 23,290 kWh |
$518 36 kW-months/year |
- - $ |
$33,476 4,715 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $320,686 Cost: $784,388 |
$182,021 | 1,904,147 | $46,169 | 3,038 | $9,677 | - | $82,819 | 11,664 | $182,021 1,904,147 kWh |
$46,169 3,038 kW-months/year |
$9,677 - $ |
$82,819 11,664 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $131,240 Cost: $377,748 |
$38,714 | 404,054 | $12,300 | 816 | $9,677 | - | $70,549 | 9,936 | $38,714 404,054 kWh |
$12,300 816 kW-months/year |
$9,677 - $ |
$70,549 9,936 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |