IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0481 # 12 Y:2016 12 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,674 $10,567 Not Implemented
SF0481 # 13 Y:2016 13 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,905 $11,333 Not Implemented
MZ0215 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,397 $8,400 Implemented
MZ0215 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $2,514 $1,500 Implemented
MZ0215 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,093 $220 Implemented
MZ0215 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Not Implemented
BS0073 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $151 $2,312 Not Implemented
BS0073 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $506 $960 Not Implemented
BS0073 # 03 Y:2016 03 2016 USE OPTIMUM TEMPERATURE $419 $116 Not Implemented
BS0073 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $108 $47 Not Implemented
BS0073 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,122 $220 Not Implemented
BS0073 # 06 Y:2016 06 2016 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $582 $316 Not Implemented
BS0073 # 07 Y:2016 07 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,966 $15,800 Not Implemented
AM0705 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,470 $5,000 Implemented
AM0705 # 02 Y:2016 02 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,905 $0 Not Implemented
AM0705 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,405 $90 Implemented
AM0705 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $600 Implemented
AM0705 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $685 Implemented
AM0705 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,360 Implemented
AM0705 # 07 Y:2016 07 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $760 $0 Not Implemented
AM0705 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $7 Implemented
MI0287 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,717 $1,400 Not Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0287 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,439 $160 Not Implemented