Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
69
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0733 # 07 Y:2017 | 07 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,290 | $1,720 | Implemented |
AM0733 # 05 Y:2017 | 05 | 2017 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,040 | $0 | Implemented |
AM0733 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,370 | $10 | Implemented |
AM0733 # 03 Y:2017 | 03 | 2017 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $32,880 | $15,000 | Implemented |
AM0733 # 02 Y:2017 | 02 | 2017 | METER WASTE WATER | $16,425 | $3,000 | Implemented |
AM0733 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,560 | $2,000 | Implemented |
AM0733 # 06 Y:2017 | 06 | 2017 | INSULATE BARE EQUIPMENT | $260 | $271 | Implemented |
AM0705 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $600 | Implemented |
AM0705 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $7 | Implemented |
AM0705 # 07 Y:2016 | 07 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $760 | $0 | Not Implemented |
AM0705 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $1,360 | Implemented |
AM0705 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,205 | $685 | Implemented |
AM0705 # 03 Y:2016 | 03 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,405 | $90 | Implemented |
AM0705 # 02 Y:2016 | 02 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,905 | $0 | Not Implemented |
AM0705 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,470 | $5,000 | Implemented |
AM0620 # 05 Y:2012 | 05 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,245 | $54 | Not Implemented |
AM0620 # 10 Y:2012 | 10 | 2012 | INSULATE BARE EQUIPMENT | $1,030 | $1,650 | Implemented |
AM0620 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,270 | $3,290 | Implemented |
AM0620 # 08 Y:2012 | 08 | 2012 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,390 | $0 | Implemented |
AM0620 # 07 Y:2012 | 07 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,505 | $750 | Not Implemented |
AM0620 # 04 Y:2012 | 04 | 2012 | REPLACE BOILER | $5,730 | $30,000 | Implemented |
AM0620 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,660 | $120 | Implemented |
AM0620 # 02 Y:2012 | 02 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,800 | $0 | Implemented |
AM0620 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,900 | $2,000 | Implemented |
AM0620 # 06 Y:2012 | 06 | 2012 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,965 | $240 | Implemented |