IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,566

matching recommendations
Reset
NAICS 3114 Fruit and Vegetable Preserving and Specialty Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0327 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $22,857 $7,377 Implemented
SF0327 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,828 $1,092 Not Implemented
SF0327 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,506 $1,461 Implemented
SF0327 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,080 $1,262 Not Implemented
SF0327 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,338 $24,888 Implemented
SF0327 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,894 $3,026 Not Implemented
SF0327 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,866 $15,620 Not Implemented
SF0327 # 09 Y:2006 09 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,234 $9,460 Implemented
SF0327 # 10 Y:2006 10 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $666 $2,370 Not Implemented
SF0327 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,873 $33,600 Not Implemented
LM0113 # 01 Y:2006 01 2006 CONDENSE OPERATION INTO ONE BUILDING $333,734 $180,000 Not Implemented
LM0113 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $16,170 Not Implemented
LM0113 # 03 Y:2006 03 2006 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $35,020 $500 Not Implemented
MS0290 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,912 $23,061 Implemented
MS0290 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $2,441 $37 Implemented
MS0290 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,302 $239 Implemented
MS0290 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,804 $259 Implemented
MS0290 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,551 $5,861 Implemented
MS0290 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $633 $1,350 Not Implemented
MS0290 # 07 Y:2006 07 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $355 $236 Implemented
SF0321 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,975 $0 Implemented
SF0321 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,657 $0 Implemented
SF0321 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,882 $0 Implemented
SF0321 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $3,112 $863 Not Implemented
SF0321 # 05 Y:2006 05 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,189 $1,561 Implemented