Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0132 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,152 | $12,430 | Implemented |
MZ0132 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $67,232 | $111,000 | Not Implemented |
MZ0132 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,895 | $2,000 | Not Implemented |
MZ0132 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,108 | $1,630 | Implemented |
MZ0132 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,620 | $3,100 | Not Implemented |
MZ0132 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,198 | $0 | Not Implemented |
MZ0132 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,911 | $1,030 | Not Implemented |
MZ0132 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,050 | $925 | Not Implemented |
MZ0132 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,603 | $3,100 | Implemented |
MZ0132 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,877 | $2,600 | Implemented |
MZ0132 # 15 Y:2013 | 15 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $791 | $1,000 | Implemented |
MZ0132 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,256 | $4,000 | Not Implemented |
MZ0132 # 02 Y:2013 | 02 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $28,581 | $40,000 | Implemented |
MZ0132 # 14 Y:2013 | 14 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $865 | $635 | Implemented |
MZ0132 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $1,565 | $640 | Implemented |
DL0107 # 03 Y:2013 | 03 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $21,280 | $100 | Not Implemented |
DL0107 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $136,640 | $115,225 | Not Implemented |
DL0107 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $2,712 | $1,626 | Not Implemented |
DL0107 # 07 Y:2013 | 07 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,439 | $106,317 | Not Implemented |
DL0107 # 04 Y:2013 | 04 | 2013 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $16,000 | $100 | Not Implemented |
DL0107 # 05 Y:2013 | 05 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,100 | $9,000 | Not Implemented |
DL0107 # 06 Y:2013 | 06 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $85,260 | $300 | Not Implemented |
DL0113 # 03 Y:2013 | 03 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,300 | $4,043 | Not Implemented |
DL0113 # 02 Y:2013 | 02 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,884 | $2,770 | Implemented |
DL0113 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,800 | $7,588 | Implemented |