IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0386 # 03 Y:2021 03 2021 USE SOLAR HEAT TO HEAT WATER $10,324 $48,514 Not Implemented
MI0386 # 01 Y:2021 01 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $247,190 $742,500 Not Implemented
MI0386 # 04 Y:2021 04 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,129 $15,000 Implemented
MI0386 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,620 $43,782 Implemented
MI0386 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,002 $1,484 Not Implemented
MI0386 # 05 Y:2021 05 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,559 $1,827 Implemented
UF0539 # 01 Y:2019 01 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $38,262 $166,880 Implemented
UF0539 # 03 Y:2019 03 2019 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,651 $11,760 Not Implemented
UF0539 # 06 Y:2019 06 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $44,758 $3,326 Not Implemented
UF0539 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,002 $3,662 Implemented
UF0539 # 02 Y:2019 02 2019 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $6,161 $518 Implemented
UF0539 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,250 $11,853 Implemented
UF0521 # 10 Y:2018 10 2018 MAKE A NEW BY-PRODUCT $243,164 $58,810 Implemented
UF0521 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,195 $15,000 Implemented
UF0521 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,972 $4,143 Implemented
UF0521 # 03 Y:2018 03 2018 REPAIR AND ELIMINATE STEAM LEAKS $13,844 $562 Implemented
UF0521 # 09 Y:2018 09 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $39,645 $66,000 Implemented
UF0521 # 02 Y:2018 02 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $41,132 $314,072 Implemented
UF0521 # 06 Y:2018 06 2018 IMPROVE COMBUSTION CONTROL CAPABILITY $3,586 $2,800 Implemented
UF0521 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,356 $0 Implemented
UF0521 # 08 Y:2018 08 2018 INSTALL OCCUPANCY SENSORS $1,160 $1,149 Implemented
UF0521 # 01 Y:2018 01 2018 INCREASE AMOUNT OF CONDENSATE RETURNED $45,855 $11,386 Implemented
MI0327 # 01 Y:2018 01 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,286 $68,000 Not Implemented
MI0327 # 07 Y:2018 07 2018 USE UTILITY CONTROLLED POWER MANAGEMENT $2,349 $80 Implemented
MI0327 # 08 Y:2018 08 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,910 $40 Not Implemented