IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 31141 Frozen Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0304 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $577 $976 n/a
IC0304 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $335,865 $2,216,227 n/a
IC0304 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,880 $3,863 n/a
IC0304 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,066 $4,623 n/a
IC0304 # 06 Y:2024 06 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,094 $4,720 n/a
IC0304 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,023 $0 n/a
IC0304 # 08 Y:2024 08 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,654 $250 n/a
IC0304 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $32,173 $3,405 n/a
IC0304 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,108 $0 n/a
IC0173 # 02 Y:2010 02 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,492 $0 Not Implemented
IC0173 # 11 Y:2010 11 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $146 $0 Not Implemented
IC0173 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $287 $610 Not Implemented
IC0173 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $281 $0 Not Implemented
IC0173 # 09 Y:2010 09 2010 UPGRADE CONTROLS ON COMPRESSORS $5,015 $0 Not Implemented
IC0173 # 07 Y:2010 07 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,649 $3,267 Not Implemented
IC0173 # 01 Y:2010 01 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,578 $14,911 Not Implemented
IC0173 # 04 Y:2010 04 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $188 $497 Not Implemented
IC0173 # 05 Y:2010 05 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $310 $150 Not Implemented
IC0173 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $967 $682 Not Implemented
IC0173 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,982 $5,951 Not Implemented
IC0172 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,201 $0 Not Implemented
IC0172 # 03 Y:2010 03 2010 INSTALL OCCUPANCY SENSORS $1,944 $360 Not Implemented
IC0172 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $562 $0 Not Implemented
IC0172 # 06 Y:2010 06 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $613 $1,248 Not Implemented
IC0172 # 07 Y:2010 07 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,978 $72 Not Implemented