Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 31142 | Fruit and Vegetable Canning, Pickling, and Drying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0505 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,366 | $14,494 | Not Implemented |
AS0506 # 06 Y:2021 | 06 | 2021 | INSTALL OCCUPANCY SENSORS | $7,913 | $1,399 | Not Implemented |
AS0506 # 05 Y:2021 | 05 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,417 | $27,733 | Not Implemented |
AS0506 # 04 Y:2021 | 04 | 2021 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $11,446 | $21,173 | Not Implemented |
AS0506 # 03 Y:2021 | 03 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,228 | $16,466 | Not Implemented |
AS0506 # 02 Y:2021 | 02 | 2021 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $32,780 | $1,503 | Not Implemented |
AS0506 # 01 Y:2021 | 01 | 2021 | COMBINE UTILITY METERS | $83,765 | $2,853 | Not Implemented |
AS0505 # 07 Y:2021 | 07 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,033 | $3,432 | Not Implemented |
AS0505 # 06 Y:2021 | 06 | 2021 | INSTALL OCCUPANCY SENSORS | $1,149 | $1,295 | Not Implemented |
AS0505 # 05 Y:2021 | 05 | 2021 | KEEP EQUIPMENT CLEAN | $4,063 | $464 | Implemented |
AS0505 # 04 Y:2021 | 04 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,270 | $200 | Not Implemented |
AS0505 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $67,347 | $326,860 | Not Implemented |
AS0505 # 01 Y:2021 | 01 | 2021 | USE LESS WASTEFUL PACKAGING | $178,199 | $183,215 | Implemented |
UU0179 # 01 Y:2021 | 01 | 2021 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $72,600 | $4,000 | Not Implemented |
UU0179 # 08 Y:2021 | 08 | 2021 | INSULATE BARE EQUIPMENT | $345 | $747 | Not Implemented |
UU0179 # 07 Y:2021 | 07 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $617 | $50 | Not Implemented |
UU0179 # 06 Y:2021 | 06 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,013 | $6,614 | Implemented |
UU0179 # 05 Y:2021 | 05 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,131 | $100 | Implemented |
UU0179 # 04 Y:2021 | 04 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,472 | $8,300 | Not Implemented |
UU0179 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,891 | $1,233 | Not Implemented |
UU0179 # 02 Y:2021 | 02 | 2021 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $27,935 | $2,000 | Implemented |