IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 311421 Fruit and Vegetable Canning
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0347 # 05 Y:2013 05 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $185 $570 Not Implemented
SU0347 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $491 $935 Not Implemented
SU0347 # 03 Y:2013 03 2013 ELIMINATE/REDUCE AN OPERATION $10,027 $5,789 Not Implemented
SU0347 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $387 $144 Not Implemented
SU0347 # 01 Y:2013 01 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,147 $0 Not Implemented
LE0339 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,390 $13,920 Not Implemented
LE0339 # 11 Y:2012 11 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $59,246 $10,500 Not Implemented
LE0339 # 10 Y:2012 10 2012 REPAIR OR REPLACE STEAM TRAPS $13,433 $0 Implemented
LE0339 # 08 Y:2012 08 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $11,007 $20,000 Not Implemented
LE0339 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,689 $3,000 Not Implemented
LE0339 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,612 $13,428 Implemented
LE0339 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $2,652 $3,590 Not Implemented
LE0339 # 05 Y:2012 05 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,198 $9,800 Implemented
LE0339 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,354 $70,000 Not Implemented
LE0339 # 09 Y:2012 09 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $28,832 $20,000 Not Implemented
LE0339 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,280 $1,000 Implemented
SU0295 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $90 $724 Not Implemented
SU0295 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,943 $74,298 Implemented
SU0295 # 06 Y:2010 06 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,800 $1,649 Not Implemented
SU0295 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $29,403 $27,649 Implemented
SU0295 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,178 $1,225 Implemented
SU0295 # 03 Y:2010 03 2010 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $595,177 $272,656 Implemented
SU0295 # 02 Y:2010 02 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,022 $0 Not Implemented
SU0295 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,574 $0 Implemented
SU0208 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $1,250 Implemented