IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

619

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0257 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $600 $752 Implemented
MZ0257 # 07 Y:2018 07 2018 USE OPTIMUM THICKNESS INSULATION $7,678 $7,480 Implemented
MZ0257 # 08 Y:2018 08 2018 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $839 $1,900 Implemented
MZ0257 # 09 Y:2018 09 2018 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,294 $5,330 Implemented
MZ0257 # 10 Y:2018 10 2018 USE COMPRESSOR AIR FILTERS $222 $200 Implemented
MZ0257 # 12 Y:2018 12 2018 MINIMIZE WATER USAGE $37,478 $0 Implemented
SF0520 # 02 Y:2018 02 2018 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $7,652 $800 Implemented
SF0520 # 03 Y:2018 03 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,563 $136 Implemented
SF0520 # 04 Y:2018 04 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $4,469 $4,039 Implemented
SF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,296 $8,179 Implemented
SF0520 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $942 $900 Implemented
SF0520 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,938 $24,858 Implemented
SF0520 # 09 Y:2018 09 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,289 $953 Implemented
SF0519 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $9,168 $23,469 Implemented
UU0131 # 01 Y:2018 01 2018 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $242,000 $1,000 Implemented
UU0131 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $76,380 $1,000 Implemented
UU0131 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,471 $39,272 Implemented
UU0131 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $17,732 $2,030 Implemented
UU0131 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,477 $150 Implemented
UU0131 # 07 Y:2018 07 2018 INSTALL REPLACEMENT DOORS $4,539 $300 Implemented
SF0516 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,768 $350 Implemented
SF0516 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,647 $300 Implemented
SF0516 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $875 $200 Implemented
SF0516 # 05 Y:2018 05 2018 REPAIR AND ELIMINATE STEAM LEAKS $488 $200 Implemented
SF0516 # 06 Y:2018 06 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $468 Implemented