IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2001 # 11 Y:2020 11 2020 OPTIMIZE PLANT POWER FACTOR $31,564 $19,285 Not Implemented
UK2001 # 10 Y:2020 10 2020 REPLACE BOILER $10,114 $45,600 Not Implemented
UK2001 # 09 Y:2020 09 2020 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $252,728 $102,800 Not Implemented
UK2001 # 08 Y:2020 08 2020 INSULATE BARE EQUIPMENT $2,547 $1,006 Not Implemented
UK2001 # 07 Y:2020 07 2020 CLEAN CONDENSER TUBES $4,023 $8,700 Implemented
UK2001 # 06 Y:2020 06 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $118,102 $6,775 Not Implemented
UK2001 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,684 $2,240 Not Implemented
UK2001 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $571 $875 Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented
UK2001 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK1511 # 02 Y:2015 02 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,293 $0 Not Implemented
UK1511 # 14 Y:2015 14 2015 INSULATE FEEDWATER TANK $1,113 $862 Implemented
UK1511 # 13 Y:2015 13 2015 INSTALL TURBULATORS $8,026 $9,000 Not Implemented
UK1511 # 12 Y:2015 12 2015 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,205 $18,400 Not Implemented
UK1511 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $552 $0 Implemented
UK1511 # 10 Y:2015 10 2015 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $2,199 $1,865 Not Implemented
UK1511 # 09 Y:2015 09 2015 UPGRADE OBSOLETE EQUIPMENT $2,127 $14,000 Implemented
UK1511 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $737 $1,500 Implemented
UK1511 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,050 $0 Implemented
UK1511 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,159 $1,371 Implemented
UK1511 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,582 $51,370 Implemented
UK1511 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $596 $0 Implemented
UK1511 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $9,011 $8,260 Implemented
UK1511 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $457,639 $1,000,000 Implemented