IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0522 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,915 $89,600 Implemented
IA0516 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,297 $376 Implemented
IA0516 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,151 $2,005 Implemented
IA0516 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,528 $2,790 Implemented
IA0516 # 01 Y:2014 01 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,115 $10,277 Implemented
IA0451 # 05 Y:2010 05 2010 REDUCE VENTILATION AIR $1,483 $2,000 Implemented
IA0451 # 04 Y:2010 04 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,433 $500 Implemented
IA0451 # 03 Y:2010 03 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,659 $140 Implemented
IA0451 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,102 $1,000 Implemented
IA0451 # 01 Y:2010 01 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,327 $1,729 Implemented
IA0398 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $861 $555 Implemented
IA0398 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $742 $580 Implemented
IA0398 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $255 $340 Implemented
IA0398 # 07 Y:2006 07 2006 REPAIR AND ELIMINATE STEAM LEAKS $7,646 $1,000 Implemented
IA0398 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $9,808 $6,000 Implemented
IA0398 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,710 $1,000 Implemented
IA0398 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,700 $39 Implemented
IA0377 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,676 $172 Implemented
IA0377 # 11 Y:2005 11 2005 INSTALL REPLACEMENT DOORS $725 $240 Implemented
IA0377 # 10 Y:2005 10 2005 INSTALL TIMERS AND/OR THERMOSTATS $2,898 $456 Implemented
IA0377 # 08 Y:2005 08 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,988 $5,000 Implemented
IA0377 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,352 $1,000 Implemented
IA0377 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,064 $1,078 Implemented
IA0377 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,602 $2,146 Implemented
IA0377 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,838 $4,329 Implemented