IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

79

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0710 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,550 $1,000 Not Implemented
OR0710 # 06 Y:2018 06 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,410 $3,742 Not Implemented
OR0710 # 04 Y:2018 04 2018 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $19,538 $19,269 Not Implemented
OR0710 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,922 $12,567 Not Implemented
OR0710 # 03 Y:2018 03 2018 UPGRADE CONTROLS ON COMPRESSORS $15,485 $1,280 Not Implemented
OR0710 # 02 Y:2018 02 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,220 $60,550 Not Implemented
OR0710 # 01 Y:2018 01 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $80,821 $56,937 Not Implemented
OR0709 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,418 $45,772 Not Implemented
OR0709 # 01 Y:2018 01 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $60,750 $77,700 Not Implemented
OR0709 # 03 Y:2018 03 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,478 $1,000 Not Implemented
OR0709 # 04 Y:2018 04 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,664 $1,000 Not Implemented
OR0709 # 02 Y:2018 02 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,023 $49,521 Not Implemented
OR0709 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,210 $0 Not Implemented
OR0709 # 07 Y:2018 07 2018 UPGRADE CONTROLS ON COMPRESSORS $1,651 $7,363 Not Implemented
OR0672 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,924 $26,614 Not Implemented
OR0672 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $39,775 $138,248 Not Implemented
OR0672 # 02 Y:2016 02 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $21,014 $35,396 Not Implemented
OR0656 # 05 Y:2015 05 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,282 $22,500 Implemented
OR0656 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $317,386 $0 Not Implemented
OR0656 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,591 $27,789 Implemented
OR0656 # 02 Y:2015 02 2015 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $188,688 $247,000 Implemented
OR0656 # 01 Y:2015 01 2015 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,308,919 $1,300,000 Implemented
OR0594 # 01 Y:2012 01 2012 INSTALL AN UNINTERUPTABLE POWER SUPPLY $393,360 $20,880 Not Implemented
OR0594 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $2,867 $2,708 Not Implemented
OR0594 # 05 Y:2012 05 2012 INSTALL AUTOMATIC STACK DAMPER $3,989 $5,325 Not Implemented