IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 3115 Dairy Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0732 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,470 $6,750 Implemented
AM0732 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,610 $1,255 Not Implemented
AM0732 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $2,410 $500 Not Implemented
AM0732 # 01 Y:2017 01 2017 TREAT AND REUSE RINSE WATERS $19,732 $5,800 Implemented
WM0102 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $1,239 $863 Not Implemented
WM0102 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $2,034 $4,700 Not Implemented
WM0102 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $5,282 Not Implemented
WM0102 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,200 $1,100 Not Implemented
WM0102 # 03 Y:2017 03 2017 REPAIR AND ELIMINATE STEAM LEAKS $9,764 $1,490 Not Implemented
WM0102 # 02 Y:2017 02 2017 USE POWER DURING OFF-PEAK PERIODS $23,950 $64,500 Not Implemented
WM0102 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $149,714 $205,925 Not Implemented
NC0583 # 07 Y:2017 07 2017 INSULATE FEEDWATER TANK $665 $1,106 Implemented
NC0583 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $2,529 $5,865 Implemented
NC0583 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $6,456 $7,000 Not Implemented
NC0583 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,222 $100 Not Implemented
NC0583 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $200 Implemented
NC0583 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,519 $6,412 Implemented
NC0583 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $61,111 $160,000 Not Implemented